Asset Task / SP

Edit Asset Structure Code - A summary of the activity

What you can do in this page

Prerequisites

Glossary

Basics of using a Ramco iEnterprise Series 4.0 web page

Using On Line Help

This page allows you to attach task or procedure categories to the asset structure. The task and procedure categories are automatically attached to the equipment that are created from the asset structure.

The “Asset Task / SP” page appears.

Asset Structure

The asset structure for which you wish to attach task or procedure categories. The description of the asset structure is displayed alongside.

 

Zoom facility available.

Type

The type of the asset structure, which can be “Rotables” or “Normal”.

The system lists the task or procedure categories that are already attached to the asset structure, in the multiline. You can modify or delete these details, or add new task or procedure categories.

Task / Proc.

Use the drop-down list box to specify whether you wish to attach a task or a procedure category. The system provides the options “Task” or “SP”.

Category Code

The task or procedure category that must be attached to the asset structure (Alphanumeric, 30). Ensure that the task or procedure category is already defined in the “Define Task / SP Categories” activity of the “Task” business component and is in “Active” status.

 

Press <Enter>. The system retrieves the “Description” field in the multiline.

 

Help facility available.

The system displays the following field in the multiline:

Desc.

The description of the task or procedure category.

Enter the following field:

Remarks

Any additional information about attaching the task or procedure category to the asset structure (Alphanumeric, 255).

The system displays the following fields in the “Record Statistics” group box:

Created By

The login ID of the user who created the asset structure.

Created Date

The date and time on which the asset structure was created.

Last Modified By

The login ID of the user who last modified the asset structure.

Last Modified Date

The date and time on which the asset structure was last modified.

 

 

 

 

 

 

 

 

 

 

 

Prerequisite

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this page

Attach task or procedure categories to the asset structure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach task or procedure categories to the asset structure

The task and procedure categories attached to the asset structure, get automatically attached to the equipment that are created from the asset structure.