Viewing calibration jobs due on the equipment for the specific period
Click the “Calibration Forecast” tab in the “Condition Monitoring Folders” page.
The system retrieves in the multiline all the calibration schedules due on the equipment during the period specified in the “From Date” and “To Date” fields, in the “Search Criteria” group box.
|
Location |
The location of the equipment for which the calibration schedule is due. |
|
Equipment |
The equipment for which the calibration schedule is due. |
|
Calib. Sch. No. |
The calibration schedule that is due on the equipment. |
|
Description |
The description of the calibration schedule. |
|
Next Due Date |
The next due date of the calibration schedule. |
Check the box in the multiline to select the calibration schedule for generating calibration orders.
Select the “Generate Calibration Order” link to generate calibration orders for the selected calibration schedule.
Click the hyperlinked calibration schedule number in the multiline to view its details.