This page allows you to modify the fixed schedules that have already been defined for the preventive maintenance template. Tell me more.
Select the Fixed Schedule link from the bottom of the Edit PM Template page.
The "Fixed Schedule" page appears.
The system displays the following fields:
PM Template |
The preventive maintenance template on which fixed schedules must be defined. |
The description of the template is displayed alongside. |
|
|
Zoom facility available |
Enter the following fields in the Calendar Based multiline:
Date |
The date on which the preventive maintenance must be performed (Date Format). If you are modifying this field, ensure that the date is the current date or a future date. Also ensure that the date is unique to the multiline. |
Remarks |
Any additional information about the schedule (Alphanumeric, 255). |
Check the box in the Select column of the multiline to select the rows that you wish to delete from the multiline.
Click the Delete icon in the tool bar above the multiline to delete the selected rows in the multiline.
Enter the following fields in the Usage Based multiline:
Parameter |
The parameter based on which the preventive maintenance must be performed on the equipment or location (Alphanumeric, 30). Ensure that the parameter is already defined as a consumption parameter in the Create Parameter activity of the Equipment Induction business component and is in the Active status. |
|
|
|
|
Help facility available |
|
Press <Enter>. The system retrieves the UOM field in the multiline. |
|
The system displays the following field: |
|
UOM |
The unit of measurement of the parameter. |
Enter the following fields:
Value |
The value of the parameter at which the preventive maintenance must be carried out on the equipment or location (Decimal). Ensure that the value is a positive number. Also ensure that the value is greater than the present value of the parameter as on the current date. |
Note: Ensure that the parametervalue combination is unique to the multiline.
Latest By Date |
The latest date by which the preventive maintenance must be performed (Date Format). If you are modifying this field, ensure that date is not a past date. |
Remarks |
Any additional information about the parameter (Alphanumeric, 30). |
Check the box in the Select column of the multiline to select the parameters that you wish to delete.
Click the Delete icon in the tool bar above the multiline to delete the selected parameters in the multiline.
Click the Edit pushbutton to edit the details of the fixed schedules.
Note: The system saves the details of the schedules and displays the UOM field in the multiline.
The system displays the following fields in the Record Statistics group box:
Created By |
The login ID of the user who defined the template. |
Created Date |
The date and time at which the schedule was defined. |
Last Modified By |
The login ID of the user who last modified the template. |
Last Modified Date |
The date and time at which the schedule was last modified. |
Editing fixed schedules of the preventive maintenance template - An overview
This page allows you to modify the fixed schedules that have already been defined for the preventive maintenance template.
If you have defined a calendar-based schedule, you can modify the date on which the preventive maintenance is due on the equipment or location and any other additional information about defining the fixed schedules for the preventive maintenance template.
If you have defined a usage-based schedule, you can modify the parameter, the value of the parameter at which the preventive maintenance must be done, the latest date by which the preventive maintenance must be carried out and any other additional information about the schedule.
Create Parameter under Equipment Induction business component