This page allows you to view the tools that are required for carrying out the preventive maintenance work order. Tell me more.
Select the “Tools Requirement” link from the bottom of the “View PM Schedule” page.
The “Tool Requirement” page appears.
The system displays the following fields:
PM |
The preventive maintenance schedule number for which tool requirements must be viewed. |
The description of the schedule is displayed alongside. |
|
Zoom facility available |
|
PM On |
The maintainable object on which preventive maintenance must be carried out. The system displays “Equipment” or “Location”. |
Code |
The equipment or location on which preventive maintenance must be carried out. |
The description of the equipment or location is displayed alongside. |
|
Zoom facility available |
|
The system displays the details of the tools that are specified for carrying out preventive maintenance, in the “Tools” multiline. |
|
Tool Code |
The tool required for carrying out preventive maintenance. |
Desc. |
The textual description of the tool. |
Qty. (Nos.) |
The number of tools required. |
Duration (Hrs.) |
The number of hours for which the tool is required. |
Rate |
The unit rate per hour of the tool. |
Est. Cost |
The estimated cost of utilizing the tool for carrying out preventive maintenance. |
Remarks |
Any additional information about specifying the tool for carrying out preventive maintenance. |
The system displays the following fields in the “Record Statistics” group box: |
|
Created By |
The login ID of the user who defined the schedule. |
Created Date |
The date and time at which the schedule was defined. |
Last Modified By |
The login ID of the user who last modified the schedule. |
Last Modified Date |
The date and time at which the schedule was last modified. |
Viewing tools that are required for carrying out preventive maintenance – An overview
This page allows you to view the tools that are required for carrying out the preventive maintenance work order. You can view the details of the tools such as the tool code, the number of tools required, the number of hours for which the tool is required and any other information about specifying the tool for the preventive maintenance schedule.