Options

Unified Glossary

Basics of using a Ramco iEnterprise Series 4.0 Web Page

Using Online Help

This activity allows you to define the default settings for the various fields in the activities. Tell me more.

The “Options” page appears.

Max. Planning Period For IO Generation (Days)

The maximum number of days for which inspection orders can be generated starting from the current system date (Integer).

Note: The system throws up an error if the period for which inspection orders must be generated is more than the period specified in this field.

Set Master Route As

Use the drop-down list box to set the master route. The system fills in this field with the routes that have been defined in the “Create Route” activity and are in the “Active” status. Leave the field blank, if you do not wish to specify any master route. The system leaves the field blank, by default.

Combine IO For Same Work Group

Use the drop-down list box to specify whether you wish to combine the inspection jobs that must be carried out by a work group, and those belonging to the same type and category, into a single inspection order. The system provides the options: “Yes” and “No”.