This activity allows you to define the default settings for the various fields in the activities. Tell me more.
Select the “Set Options” link under the “Predictive Maintenance” business component.
The “Options” page appears.
Enter the following fields:
|
Max. Planning Period For IO Generation (Days) |
The maximum number of days for which inspection orders can be generated starting from the current system date (Integer). |
Note: The system throws up an error if the period for which inspection orders must be generated is more than the period specified in this field.
|
Set Master Route As |
Use the drop-down list box to set the master route. The system fills in this field with the routes that have been defined in the “Create Route” activity and are in the “Active” status. Leave the field blank, if you do not wish to specify any master route. The system leaves the field blank, by default. |
|
Combine IO For Same Work Group |
Use the drop-down list box to specify whether you wish to combine the inspection jobs that must be carried out by a work group, and those belonging to the same type and category, into a single inspection order. The system provides the options: “Yes” and “No”. |
Click the “Submit” pushbutton to set the options defined in this page.