A maintain procedure offers the ability to maintain the procedure or conditions that has been followed. It includes activities, skills, tools, spares and other resources. We use maintain procedure to determine these all conditions into one procedure.

The “Maintain Procedure” page appears.

      - Clicking this icon available near certain fields takes you to the help page of the respective field.

To create a new maintain procedure details

Procedure                 

A unique Id identifying the procedure.

Description

On selection of procedure, description of procedure is displayed.

Status

Use the drop-down list box to specify the status of the procedure. The system provides the options “Active” and “Inactive”. Set the status as “Inactive” if you wish to disable the procedure from any future reference from other activities. The system displays “Active” by default.

Type

Use the drop-down list box to identify the type of the procedure. The system lists all types that are in “Active” status as defined in the “Define Task Types” activity.

Estimated Duration(Hrs.)

The estimated duration in hours within which the procedure must be completed.

Remarks

Any remarks pertaining to maintain the procedure must be specified.

Long Description

The long description about maintaining the procedure.

Category

Use the drop-down list box to select the category. The combo is loaded with the values “Cleaning”, “ECE”, “GM”, “Ins”, etc.

Revision No.

The revision number if you wish to track the changes done on the procedure.  This number represents the number of revisions made to the procedure.

Revised On

The date on which the procedure is revised or modified. The system displays the current date on clicking the “Create” pushbutton, if you have entered a revision number in the “Revision No.” field.

Supervisor

The unique number that identifies the Supervisor.

Lead code

The unique code that identifies the lead for maintaining the procedure.

Work Group

Use the drop-down list box to select the specified work group.

Supervisor Name

On selection of the supervisor code, the name of the supervisor is displayed.

Lead Name

On selection of lead code, the name of the lead is displayed.

Work Group Description

On selection of the work group from the combo, the system displays the work group description.

Tab – Task List

 

Task

The unique code that identifies the task.

Task Description

On selection of the task code, the system displays the description of the task.

Task Duration(Hrs.)

The numbers of hours required for the completion of task.

Equipment Condition

Use the drop-down list box to select the condition of equipment. The combo is loaded with “Not applicable”, “Offline”, “Online”.

Type

The type of the task, as defined in the “Create Task” activity.

Sequence Number

The order in which the task must be performed. Ensure that the sequence number is a positive integer and is unique in the multiline.

Tab – Additional Requirements      

 

Additional Requirements

Use the drop-down list box to select the additional requirements. 

Description

On selection of additional requirements, the system displays the description.

Estimated Duration(Hrs.)

On selection of the additional requirements, the estimated time duration will be displayed.

 

This tab consists of the following sub tabs:

Tab – Skills

 

Skill Code

A unique code identifying the specified skill.

Description

On selecting the skill code, the description of the skill will be displayed.

Duration(Hrs.)

The number of hours for which the skill is required.

Quantity(Nos.)

The number of people possessing the skill, required for executing the  task or procedure.

Skill Cost/Hr

The unit cost of utilizing the skill per hour is displayed.

Tab – Tools

Tool Code

The tool to be specified for the task or procedure. A unique code identifying the tool is to be specified.

Description

On selecting the tool code, the system displays the description of the tool.

Duration(Hrs.)

The number of the hours for which the tool is required.

Quantity(Nos.)

The number of tools, required for the completion of the task or procedure.

Tool Cost/Hr

The cost of utilizing the tool per hour is displayed.

Tab – Spares

 

Item

A unique code identifying the specified item.

Variant

The variant of the standard spare part.

Description

On selecting the item code, the system displays the description of the item.

UOM

A unique code identifying the UOM is to be specified.

Quantity(Nos.)

The total quantity to be specified in numbers.

Warehouse

A unique identifying the Warehouse is to be specified.

Item Status

The status of the item is to be specified.

Standard Cost/Unit

The standard cost/unit will be calculated and displayed automatically.

 

Description

The description of the non-standard items is to be specified.

UOM

A unique code identifying the UOM is to be specified.

Quantity(Nos.)

The total quantity to be specified in numbers.

Cost/Unit

The total cost/unit is to be specified.

Tab – Service                         

 

Line No

The system displays the line number automatically.

Service code

The unique code that identifies the service.

Service Description

On selecting the service code, the system displays the description of the service.

BOM

The unique code that identifies the Bill of material for the service.

UOM

A unique code identifying the UOM.

Total estimated quantity

The total estimated quantity is to be specified.

Estimated unit cost

The estimated unit cost is to be specified.

Remarks

Any remarks pertaining to the service must be specified.

Supervisor

A unique code or identification number of the supplier.

Preferred Supplier

The unique code that identifies the preferred supervisor.

Name

On selecting the preferred supplier, the name of the preferred supplier will be displayed.

Tab – Other Resource  

 

Other Resource Code

A unique code identifying the tool is to be specified.

Description

The description of the tool is displayed.

Duration(Hrs.)

The number of the hours for which the resource is required.

Quantity(Nos.)

The number of resources required for the completion of the task or procedure.

Resource Cost/Hr.

The unit cost of utilizing the resource per hour is displayed.

 

To modify or update the existing Maintain Procedure details

Procedure

A unique Id identifying the procedure is specified.

Description

The description of the procedure is displayed.

Type

Use the drop-down list box to identify the type of the procedure. The system lists all types that are in “Active” status as defined in the “Define Task Types” activity.

Status

Use the drop-down list box to specify the status of the procedure. The system provides the options “Active” and “Inactive”. Set the status as “Inactive” if you wish to disable the procedure from any future reference from other activities. The system displays “Active” by default.

Group By

Use the drop-down list box to select the group by. The combo is loaded with the values “Procedure”, “Supervisor” and the “Work Group”.

 

The system displays the corresponding equipment details in the right hand side header and tabs. You can modify the required fields.

 

Created By

The login ID of the user who created the Maintain Procedure. The date and time at which the Maintain Procedure was created.

Modified By

The login ID of the user who modified the Maintain Procedure. The date and time at which the Maintain Procedure was last modified.