This page allows you to record the actuals of the tools that are utilized during the execution of the work order. Tell me more.

The “Tools Actuals” page appears.

WO No.

The work order for which you wish to record the tools that are utilized (Alphanumeric, 18).

 

Press <Enter>. The system retrieves the details of the work order. The description of the work order is displayed alongside.

 

Zoom facility available

The system displays the following field:

WO Status

The status of the work order.

Note: You can record the actuals for labor utilized on a work order only when it is in the "Scheduled", "Deferred", "Interrupted", "In progress" or "Completed" status.

The system fills in the “Actuals On” drop-down list box with the tasks belonging to the work order and retrieves in the multiline the tools that are already specified for the work order.

Actuals On

Use the drop-down list box and select “Work Order”, to specify the tools that are utilized for the work order. If you wish to specify tools for the tasks belonging to the work order, select the appropriate task from the drop-down list box. The system displays “Work Order” by default.

The system displays the following fields:

WO On

The maintainable object on which the work order is raised, which can be “Equipment” or “Location”.

Code

The identifier of the equipment or location.

 

The description of the equipment or location is displayed alongside.

 

Zoom facility available

Planning Group

The planning group of the work order.

Work Group

The work group that is responsible for carrying out the work order.

Sch. Start Date

The date on which the work order was scheduled to start.

Sch. Compl. Date

The date on which the work order was scheduled to complete.

Act. Start Date

The actual start date and time of the work order.

Act. Compl. Date

The date and time at which the work order must be completed.

Assigned Tool Hrs.

The number of hours for which the tool has been assigned for the work order.

Actual Hrs.

The total number of hours for which the tool has actually been utilized for the work order.

Tool Code

The tool utilized for the work order (Alphanumeric, 30). Ensure that the tool has already been defined in the “Define Tool” activity of the “Tools” business component and is in the “Active” status.

 

Help facility available

 

Press <Enter>. The system retrieves the “Description” field in the multiline.

Tool Sr. No.

The serial number of the tool (Alphanumeric, 20).. Ensure that the tool serial number has already been defined for the tool in the “Define Tool” activity of the “Tools” business component.

 

Help facility available

 

Press <Enter>. The system retrieves the “Description” field in the multiline.

Qty. (Nos.)

The number of tools utilized for carrying out the work order (Decimal). Ensure that the quantity is not negative or zero. If you leave this field blank, the system displays “1”, by default.

From Date

The starting date from which the tool has been utilized for the work order (Date Format). Data entry in this field is mandatory if you have specified a tool code in the “Tool Code” field. Ensure that the date entered here is not later than the date entered in the “To Date” column and the current system date.

Time

The time from which the tool has been utilized for the work order (Time Format). The system displays "0.00" if you leave the field blank.

To Date

The date till which the tool has been utilized for the work order (Date Format). Ensure that the date entered here is not later than the current date. If you leave the field blank, the system the calculates this date as the sum of the date entered in the “From Date” field and the number of hours entered in the “Hours Worked” field.

Time

The time till which the tool has been utilized for the work order (Time Format). If you have specified a date in the "To Date" field and have left this field blank, the system automatically assigns the current time if  you have specified the current date in the "To Date" field or "23.59" if it is a previous date.

Note: Ensure that the tool code is not overlapping for the same date and time combination.

Hours Worked

The number of hours for which the tool has been utilized for the work order (Decimal). Ensure that the hours entered is not negative. Also ensure that the hours entered in this field is not greater than the difference between the dates entered in the "From Date" and "To Date" columns.

The system displays the following fields in the multiline:

Desc.

The description of the tool.

As Of Date

The date on which the details of the tool are recorded in the system.

Time

The time on which the details of the tool are recorded in the system.

The system saves the other tool actuals for the work order with the following details:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recording the tools utilized for the work order – An overview

Report WO Actuals - A summary of the activity

This page allows you to record the actuals of the tools that are utilized during the execution of the work order. You can record the tool actuals for the work order selected in the previous page. You can also enter a work order in this page and record the actuals of the tools that are utilized during its execution. You can record the actuals of the tools that are utilized for the work order or for the tasks belonging to the work order.

You can record the tool actuals by specifying the following details:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisite

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this page

Record the actuals of tools that are utilized for the work order

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Record the actuals of tools that are utilized for the work order