View Equipment Down Time

Unified Glossary

Basics of using a Ramco iEnterprise Series 4.0 Web Page

Using Online Help

This page allows you to view the down time of equipment or location, on which the work order selected from the main page was raised. Tell me more.

The “View Equipment Down Time” page appears.

WO No.

The work order for which you wish to view equipment down time (Alphanumeric, 18).

 

Press <Enter>. The system retrieves the details of the work order. The description of the work order is displayed alongside.

 

Zoom facility available

The system displays the following fields:

WO On

The maintainable object on which the work order is raised, which can be “Equipment” or “Location”.

Code

The identifier of the equipment or location.

WO Status

The status of the work order.

WO Duration

The duration of the work order.

Work Group

The work group which is responsible for carrying out the work on the work order.

Planning Group

The planning group of the work order.

Sch. Start Date

The date and time at which the work order is scheduled to start.

Sch. Compl. Date

The date and time at which the work order is scheduled to be completed.

Total Eqp. Down Hrs.

The number of hours during which the equipment was down.

Production Affected Down Hrs.

The number of hours during which the production was affected due to the equipment being down.

Down Time Comments

Any information pertaining to the down time of the equipment.

From Date

The starting date from which the equipment is down.

To Date

The date till which the equipment is down.

Eqp. Down Hrs

The number of hours the equipment is down between the dates specified in the “From Date” and “To Date” fields.

Production Affected Down Hrs.

The number of hours for which the production was affected due to the equipment being down between the dates specified in the “From Date” and “To Date” fields

Comments

Any information regarding the equipment being down.

 The system displays the following fields in the “Record Statistics” group box:

Created By

The login ID of the user who created the work order.

Created Date

The date and time of the creation of the work order.

Last Modified By

The login ID of the user who last modified the work order.

Last Modified Date

The date and time when the work order was last modified.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

View down time of equipment – An overview

View Equipment Down Time - A summary of the activity

This page allows you to view the down time of equipment or location, on which the work order selected from the main page was raised. You can also enter a work order directly in this page and view the down time of the equipment or location on which it was raised. The system retrieves the following down time details of the equipment: