This page enables you to select the plan number for which you wish to generate the reports.
Select the “Generate Job list for Maintenance Plan” link under the “Report For Asset Life Cycle Management” business component.
The “Job List For Maintenance Plan” page appears.
Enter the following in the “Report Criteria” group box:
|
Plan No. |
The plan for which the reports must be generated (Alphanumeric, 18) |
|
Desc. |
The description of the plan (Alphanumeric, 150). You can enter the description in full or specify it partially. |
|
Plan Type |
Use the drop-down list box to select the type of the plan. The system lists all the plan types that have been defined in the “Define Plan Types” activity of the “Maintenance Plan” business component. |
|
Plan Category |
Use the drop-down list box to select the category of the plan. The system lists all the plan categories that have been defined in the “Define Plan Categories” activity of the “Maintenance Plan” business component. |
|
Plan Status |
Use the drop-down list box to select the status of the plan. The system provides the options “Fresh”, “Confirmed” and “Closed”. |
|
WO Generated |
Use the drop-down list box and set the field as “Yes” if you wish to retrieve plans for which work orders have been generated. The system provides the options “Yes” and “No”. |
|
Job List On |
Use the drop-down list box to select the equipment or location on which the jobs must be performed. The system provides the options “Equipment” and “Location”. |
|
Eqp./Loc. Code |
The equipment or location code (Alphanumeric, 30). You can enter the equipment or location code in full or specify it partially. |
Enter the following in the “Report Options” group box:
|
Report Action |
Use the drop-down list box to select the default report action. The system lists the following options:
The system displays “View”, by default. |
|
Sort By |
Use the drop-down list box to specify the order in which the entries in the report will be sorted. The system provides the options “Sch. Start date”, “Plan no” and “Plan status”. |
Select the “List of Jobs for Maintenance Plan” link to generate a report listing out the jobs that must be performed as a part of the plan.