This page allows you to select the preventive maintenance schedules for which you wish to generate reports.
Select the “Generate PM Schedules List” link under the “Report For Asset Life Cycle Management” business component.
The “PM Schedules List” page appears.
Enter the following in the “Report Criteria” group box:
|
PM No. From |
The starting number of the preventive maintenance schedules for which you wish to generate the report (Alphanumeric, 20) |
|
PM No. To |
The number till which you wish to generate the report (Alphanumeric, 20) |
|
Desc. |
The description of the preventive maintenance schedule (Alphanumeric, 150). You can enter the reason in full or specify it partially. |
|
Status |
Use the drop-down list box to select the status of the preventive maintenance schedule. The system provides the options “Active” and ”Inactive”. |
|
PM Type |
Use the drop-down list box to select the type of preventive maintenance schedule that you wish to retrieve. The system lists all the PM types that have been defined in the “Define PM Types” activity of “Preventive Maintenance” business component. |
|
Task/Proc. |
Use the drop-down list box to specify whether you wish to retrieve PM schedules based on a task or procedure. The system provides the options “Task” and “SP”. |
|
Code |
The task or procedure that must be carried out as a part of the PM schedule (Alphanumeric, 30). You can enter the task ort procedure in full or specify it partially. |
|
PM On |
Use the drop-down list box to select the maintainable object for which the preventive maintenance schedule has been raised. The system provides the options “Equipment” and “Location”. |
|
Code |
The equipment or the location on which the PM schedule has been raised (Alphanumeric, 30) |
|
Eqp. Group |
The equipment group to which the equipment specified, is a part of (Alphanumeric, 30). You can enter the equipment group in full or specify it partially. |
|
Location Group |
The location group to which the location specified, is a part of (Alphanumeric, 30). You can enter the location group in full or specify it partially. |
Enter the following in the “Report Options” group box:
|
Report Action |
Use the drop-down list box to select the default report action. The system lists the following options:
The system displays “View”, by default. |
|
Sort By |
Use the drop-down list box to specify the order in which the entries in the report will be sorted. The system provides the options. |
Select the “PM Schedule Report” link to generate the list of preventive maintenance schedules.