Plan Demands Information

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This page allows you to view the planned demand details on the selected date. Tell me more

The “Plan Demands Information” page appears.

The system displays the following:

Stocking Point

The stocking point of the selected warehouse.

Warehouse Code

The code identifying the warehouse.

Item Code

The code identifying the item.

Variant Code

The code identifying the variant of the item.

Required UOM

The required unit of measure of the item.

Item Variant Desc.

The description in the combination of item and variant.                              

Stock UOM

The unit of measure of the item in inventory.

Line No.

Use the drop-down list box to select all the line numbers from the previous page for the selected document.

The system displays the following:

Demand Date

The date on which the demand was created.                               

Plan Demand Qty.

The planned demand quantity available as on the demand date.

The system displays the following in the “Plan Demands Information” multiline:            

Demand Doc. No.

The document number generated automatically by the system identifying the demand.

Demand Doc. Date

The date on which the demand document was created.

Demand Doc. Type

The type of the demand document.

Demand Doc. Source Point

The source point of the demand document generated.

Demand Doc. Line No.

The line number automatically generated by the system identifying each demand document.

Demand Doc. Sub Line No.

The sub line number automatically generated by the system identifying each demand document.

Demand Doc. Schedule No.

The schedule number automatically generated by the system identifying each demand document.

Demand Doc. Qty.

The quantity of the demand document.

Demand Category

The category of the demand.

Note: For the item and warehouse details based on line number selected, the system retrieves all the plan demand details.

To proceed, carry out the following

 

 

 

 

 

 

 

 

 

 

 

 

 

 Plan Demands Information – An overview

Activity overview

For the stocking point, item and the warehouse, you can view the details of planned demand. You can select the line number based on which you can view the plan demand details. The total plan demand quantity on the date is displayed. For the plan demand, the demand document details along with the demand quantity are retrieved in the multiline. Let us consider an example that explodes the demand details for the plan demand quantity of 50 units and demand date “10/01/03” as follows:

Demand Document No

Demand Document Date

Demand Document Type

Demand Document Qty

FC1

10/01/03

Sales Forecast

50

 From the above table, you can view the demand information for the demand (FC1) with 50 units on “10/01/03” selected from the calling page. The receipts reserved corresponding to these demands can be viewed using the link provided at the bottom of the page.