Maintain Control Factor Sequence

Component overview

Glossary

Basics of using Ramco Enterprise series web page

Using online help

This activity allows you to prioritize the control factors present in the “Create Control Point Definition” page. You can attach the control factor with origin id as well as set the priority for each control factor. The priority of control factor is identified when an item is requested for inspection.

The “Maintain Control Factor Sequence” page appears.

Origin ID

The code identifying the origin of the control point created for an item, which could be “Inventory”, “Process Production”, “Purchase”, “Sales”.

The system displays the following in the “Control Factor Sequence Details” multiline:

Control Factor

The factors affecting the quality of the item that is to be inspected.

Priority

A unique number assigned to the control factor indicating the priority based on which the item is inspected (Integer). Mandatory. The value must be a positive integer greater than zero.

Note: If there are 4 control factors, the priority may be any value from 1 to 4.

The system displays the following:

Created By

The name of the user who created the control factor sequence.

Created Date

The date on which the control factor sequence was created.

Modified By

The name of the user who last modified the control factor sequence.

Modified Date

The date on which the control factor sequence was last modified