ECR History Details

Component overview

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This report is a transaction report. Report Information.

The “ECR History Details” page appears.

ECR No.

The number identifying the engineering change request. Mandatory.

ECR Status

Use the drop-down list box to select the status of the engineering change request. You can select from “Active”, “InActive”, “Authorized”, “Resolved” or “Implemented”. The system displays “Blank” by default on launch of the page. The options available are:

 
  • Active – indicates a valid engineering change request.

 
  • Inactive – indicates an invalid engineering change request.

 
  • Authorized – indicates an authorized engineering change request.

 
  • Resolved – indicates a resolved engineering change request.

 
  • Implemented – indicates an implemented engineering change request.

EC Need Date From

The starting date in the range of dates on which the engineering change is required. If this field is left blank, then the system displays the current date as “EC Need Date From”.

EC Need Date To

The ending date in the range of dates on which the engineering change is required.

Maintained By

Use the drop-down list box to select the “Maintained By” control unit for which the login user has EC permissions. The system retrieves the control units from the “Organization Model”. The system displays “Blank” by default on launch of the page.

Item Code

The code identifying the item under engineering change.

Variant Code

The code or number identifying the variant of the item under engineering change.

Requested By

The person who is responsible for requesting the engineering change.

The system retrieves the ECR details in ascending order based on the filter condition specified.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ECR History Details – An Overview

This report gives you the history details of all Engineering Change Request (ECR)(s) raised during the specified period.

This page allows you to set the criteria to generate ECR history details for a specific ECR. You must specify the ECR and the need date or the range of need dates in the search filters. The control unit that identifies the ECR can also be set as a part of the criteria. You can also specify the status, item or requested by as a part of the filter criteria. 

On generating the report, the system displays all the transactions based on the specified criteria. The system retrieves and displays the ECR, the person requesting the ECR, date of request, need and effective date, status of item under engineering change along with the new revision detail.