This report is a transaction report. Report Information.
Select the “ECR Status Report” link under the “DP Reports”.
The “ECR Status Report” page appears.
Enter the following field in the “Report Filters” group box:
ECR No. |
The number identifying the engineering change request. Mandatory. |
ECR Status |
Use the drop-down list box to select the status of the engineering change request. You can select from “Active”, “Inactive”, “Authorized”, “Resolved”, |
|
|
|
|
|
|
|
|
|
|
EC Need Date From |
The starting date in the range of dates on which the engineering change is required. |
EC Need Date To |
The ending date in the range of dates on which the engineering change is required. |
Maintained By |
Use the drop-down list box to select the “Maintained By” control unit for which the login user has EC permissions. The system retrieves the control units from the “Organisation Model” business component. The system displays “Blank” by default on launch of the page. |
Item Code |
The code identifying the item under engineering change. |
Component Item |
The code identifying the component item under engineering change. |
Activity Code |
The code identifying the activity of the process plan. |
Requested By |
The person who is responsible for requesting the engineering change. |
Click the “Generate Report” pushbutton to view the engineering change requirement details for the specified ECR number and ECR need date range.
The system retrieves the ECR details in ascending order based on the filter condition specified.
If ECR Need Date From is specified, then the system retrieves the ECR details for those ECR numbers whose ECR Need Date is greater than or equal to the EC Need Date From. If the EC Need Date To is also specified along with from date then the system retrieves the ECR details between the specified date range of EC Need Date.
If ECR Need Date To is specified, then the system retrieves the ECR details whose ECR Need Date is less than or equal to the EC Need Date To.
If ECR number is not specified. Then the system retrieves all ECR numbers based on the filter condition specified.
ECR Status Report – An Overview
This report provides a summarized display of all the items, product structures and process plans under engineering change. Each of the report is displayed based on the existence of the items, components and the process plans for the selected Engineering Change Request (ECR).
This page allows you to set the criteria to generate an ECR status report for a specific ECR. You must specify the ECR and the need date or the range of need dates in the search filters. The control unit that identifies the ECR can also be set as a part of the criteria. You can also specify the status, item, component item or activity as a part of the filter criteria.
On generating the report, the system displays all the transactions based on the specified criteria. The system retrieves and displays the following three reports:
4 ECR Status Report by Item Details – Displays the items, current item revision details, new item revised details along with the effective dates. This report explodes the status of all the items under engineering change for the selected ECR.
4 ECR Status Report by Component Details – Displays the component items, component item revision details, replacing item details along with the useup dates or the effective dates. This report explodes the status of all the component items under engineering change for the selected ECR.
4 ECR Status Report by Process Plan Details – Displays the activities and the effective dates. This report explodes the status of all the process plans under engineering change for the selected ECR.
All the transactions are displayed for the business unit, ECR, status, need date and type of ECR.