This page allows you to modify or add steps to the engineering change. The steps are the sequence of process to be carried out during engineering change. The engineering change for which you need to modify or add steps along with its details are retrieved from the main page. For the selected engineering change request, you can make changes to the existing process details or can also insert new details. You can specify the actual process involved in engineering change, the person who controls the process, the expected and actual dates of start and closure of the process and the time spent on each process in the multiline.
You can also delete the steps of process created for the engineering change request by selecting the appropriate records in the multiline and initiating the delete operation.
Select the “Edit EC Steps” link at the bottom of the page.
The “Edit EC Steps” page appears.
The system displays the following:
ECR No. |
The number identifying the engineering change request. |
ECR Desc. |
The description of the engineering change request. |
Zoom facility available. |
|
ECR Status |
The status of the engineering change request. It can be "Active", "Inactive", "Authorized", "Resolved" or "Implemented". The engineering change cannot be in “Implemented” status. |
Maintained By |
The “Maintained By” control unit for which the login user has EC modify permissions. |
EC Need Date |
The date on which the engineering change is required. |
EC Type |
The type of the engineering change request. It can be "Engineering", "Production", "Subcontracting" or "All". |
Modify the following in the “EC Steps” multiline, if required:
Process |
The steps of engineering change. The process cannot be left blank |
Process Owner |
The person who controls the process of engineering change. |
Status |
Use the drop-down list box to select the status of the process. You can select from "Open" or "Closed". |
Expected Start Date |
The expected start date of the process. |
Expected Due Date |
The expected End date of the process. |
Actual Start Date |
The Actual start date of the process. |
Actual End Date |
The Actual end date of the process. |
Duration (Days) |
The number of days spent on the process. |
Click the “Delete” pushbutton to delete the selected records in the multiline.
The system cannot delete the engineering change request if the ECR status is in "Authorized" or "Implemented" status and can delete the selected engineering change step details in the multiline.
Check the box in the “Select” column to select the EC steps for modifying its details.
Click the “Edit EC Steps” pushbutton to modify the engineering change steps.
The system ensures that at least one row must be entered in the multiline. The system saves the engineering change steps details for the ECR No.
The system displays the following:
Created By |
The login ID of the user who created the EC Steps. |
Created Date |
The date on which the EC Steps was created. |
Edited By |
The login ID of the user who has modified the EC Steps. |
Edited Date |
The date on which the EC Steps was modified. |