This page allows you to view the process of steps defined for the engineering change request. The system retrieves the engineering change request details from the calling page. The process details for the request displayed are also retrieved in the multline.
Select the “View EC Steps” link at the bottom of the page.
The “View EC Steps” page appears.
The system displays the following:
ECR No. |
The number identifying the engineering change request. |
ECR Desc. |
The description of the engineering change request. |
Zoom facility available. |
|
ECR Status |
The status of the engineering change request. It can be "Active", "Inactive", "Authorized", "Resolved" or "Implemented". The engineering change cannot be in “Implemented” status. |
Maintained By |
The “Maintained By” control unit for which the login user has EC modify permissions. |
EC Need Date |
The date on which the engineering change is required to be implemented. |
ECR Type |
The type of the engineering change request. It can be "Engineering", "Production", "Subcontracting" or "All". |
The system displays the following in the “EC Steps” multiline:
Process |
The steps of engineering change. |
Process Owner |
The person who controls the process of engineering change. |
Status |
The status of the process. It can be either "Open" or "Closed". |
Expected Start Date |
The expected start date of the process. |
Expected Due Date |
The expected End date of the process. |
Actual Start Date |
The Actual start date of the process. |
Actual End Date |
The Actual end date of the process. |
Duration ( Days) |
The number of days spent on the process. |
The system displays the following:
Created By |
The login ID of the user who created the EC Steps. |
Created Date |
The date on which the EC Steps was created. |
Edited By |
The login ID of the user who has modified the EC Steps. |
Edited Date |
The date on which the EC Steps was modified. |