Fixed Schedule

Prerequisites

Unified Glossary

Basics of using a Ramco iEnterprise Series 4.0 Web Page

Using Online Help

This page allows you to define fixed schedules for carrying out the preventive maintenance on equipment/location. Tell me more.

The “Fixed Schedule” page appears.

The system displays the following fields:

PM

The preventive maintenance schedule number for which fixed schedules must be defined.

 

The description of the schedule is displayed alongside.

 

Zoom facility available

PM On

The maintainable object on which preventive maintenance must be carried out. The system displays “Equipment” or “Location”.

Code

The equipment or location on which preventive maintenance must be carried out.

 

The description of the equipment or location is displayed alongside.

 

Zoom facility available

Date

The date on which the preventive maintenance must be performed (Date Format). Ensure that the date is a current date or a future date. Also ensure that the date is unique to the multiline.

Remarks

Any additional information about the schedule (Alphanumeric, 255).

Parameter

The parameter based on which the preventive maintenance must be performed on the equipment or location (Alphanumeric, 30). Ensure that the parameter is already defined as a consumption parameter in the “Create Parameter” activity of the “Equipment Induction” business component and is in the “Active” status.

 
  • If the “PM On” field is “Equipment”, ensure that the parameter is attached to the equipment in the “Create Parameter” activity of the “Equipment Induction” business component.

 
  • If the “PM On” field is “Location”, ensure that the parameter is attached to the location in the “Create Location” activity of the “Maintenance Organization” business component.

  The system displays the following field:

UOM

The unit of measurement of the parameter.

Value

The value of the parameter at which the preventive maintenance must be carried out on the equipment or location (Decimal). Ensure that the value is a positive number. Also ensure that the value is greater than the present value of the parameter as on the current date.

Note: Ensure that the parameter – value combination is unique to the multiline.

Latest By Date

The latest date by which the preventive maintenance must be performed (Date Format). Ensure that date is not a past date.

Remarks

Any additional information about the parameter (Alphanumeric, 30).

Note: The system saves the details of the schedules and displays the “UOM” field in the multiline.

The system displays the following fields in the “Record Statistics” group box:

Created By

The login ID of the user who defined the schedule.

Created Date

The date and time at which the schedule was defined.

Last Modified By

The login ID of the user who last modified the schedule.

Last Modified Date

The date and time at which the schedule was last modified.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Defining fixed schedules – An overview

Create PM Schedule - A summary of the activity

This page allows you to define fixed schedules for carrying out the preventive maintenance on equipment/location. Fixed schedules are used for carrying out one-time execution of preventive maintenance job on a specific date or parameter value.

Fixed schedules can be of two types:

Calendar-based Schedule

Calendar-based fixed schedules are used for carrying out one-time execution of preventive maintenance on a specific date. Multiple fixed dates can be specified in one preventive maintenance schedule.

Usage-based Schedule

Usage-based fixed schedules are used for carrying out one-time execution of preventive maintenance on a specific parameter value. Multiple values for multiple parameters can be specified in one preventive maintenance schedule.

You can specify the following details for defining a fixed schedule:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisite