This page allows you to specify other resources for the work order as well for the tasks that belong to the work order. Tell me more.

The “Other Resources Requirement” page appears.

The system displays the following fields:

WO No.

The work order for which other resources have to be specified.

Date

The date on which the work order was created.

Desc.

The description of the work order.

 

Zoom facility available

WO Status

The status of the work order, which can be “Fresh” or “Waitappr”.

WO On

The maintainable object on which the work order was created, which can be “Equipment” or “Location”.

Code

The identifier of the equipment or location on which the work order is raised.

 

The description of the equipment or location is displayed alongside.

 

Zoom facility available

Work Group

The work group that is responsible for carrying out the work order.

Total Est. Cost

The total estimated cost of the work order.

Select Task

Use the drop-down list box and select “Additional Requirements”, to specify other resources to the work order. If you wish to specify other resources for a task, select the appropriate task from the drop-down list box. The system displays “Additional Requirements” by default.

 

The system displays the description of the selected task alongside.

 

Zoom facility available

The system retrieves in the “Other Res.” multiline, the other resources that are already specified for the work order. You can add more resources by entering the following fields in the multiline:

Resource

The resource to be specified for the

 (Alphanumeric, 30). Ensure that the resource has already been defined in the “Define Other Resource“ activity of the “Work Group” business component and is in the “Active” status. This field cannot be modified.

 

Help facility available

 

Press <Enter>. The system retrieves the “Description” field in the multiline.

The system displays the following field:

Desc.

The description of the resource.

Qty.

The number of resources required for the completion of the work order (Decimal). Ensure that the quantity is positive.

 

Press <Enter>.

Duration (Hrs.)

The number of the hours for which the resource is required (Decimal). Ensure that the duration is positive.

 

Press <Enter>.

The system displays the following fields:

Rate

The rate per hour of utilizing the resource.

Est. Cost

The total estimated cost of utilizing the resource.

Notes

Any additional information about utilizing the resource (Alphanumeric, 255).

Note: The system updates the resource details for the work order.

The system displays the following fields in the “Record Statistics” group box.

Created By

The login ID of the user who created the work order.

Created Date

The date and time at which the work order was created.

Last Modified By

The login ID of the user who last modified the work order.

Last Modified Date

The date and time at which the work order was last modified.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Specifying other resources for the work order – An overview

Edit Work Order - A summary of the activity

This page allows you to specify other resources for the work order as well for the tasks that belong to the work order. You can specify resources to the work order that are selected in the main page.

You can enter the resource directly or select a resource using the help facility. You can also modify the details of the existing resources that have already been specified in the work order. Details such as the number of hours for which the resource is required, the number of resources required, the usage type specified for the resource and any additional information specified for the resource can be modified.

Based on the details specified for the resource the system ascertains the rate per hour of utilizing the resource and the total estimated cost of utilizing the resource.

You can also delete an existing resource from the work order or from the tasks that belong to the work order.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisite

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this page

Specify other resources to the work order

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Specify other resources to the work order

You can specify the other resource requirements of the work order in this page.