Update Equipment Down Time

What you can do in this page

Prerequisites

Unified Glossary

Basics of using a Ramco iEnterprise Series 4.0 Web Page

Using Online Help

This page allows you to record the down time of equipment or location, on which the work order selected from the main page was raised. Tell me more

The “Update Equipment Down Time” page appears.

WO No.

The work order for which you wish to record equipment down time (Alphanumeric, 18).

 

Press <Enter>. The system retrieves the details of the work order. The description of the work order is displayed alongside.

 

Zoom facility available

 

The system displays the following fields:

WO On

The maintainable object on which the work order is raised, which can be “Equipment” or “Location”.

Code

The identifier of the equipment or location.

WO Status

The status of the work order.

WO Duration

The duration of the work order.

Work Group

The work group which is responsible for carrying out the work on the work order.

Planning Group

The planning group of the work order.

Sch. Start Date

The date and time at which the work order is scheduled to start.

Sch. Compl. Date

The date and time at which the work order is scheduled to be completed.

Total Eqp. Down Hrs.

The number of hours for which the equipment was down (Decimal). Ensure that the down hours entered here are not negative.

Production Affected Down Hrs.

The number of hours for which the production was affected due to the equipment being down (Decimal). Ensure that the down hours entered here are not negative.

Down Time Comments

Any information pertaining to the down time of the equipment (Alphanumeric, 255).

 

Zoom facility available

From Date

The starting date from which the equipment is down (Date Format). Ensure that the date entered is earlier than the current system date.

To Date

The date till which the equipment is down (Date Format). Ensure that the date entered is earlier than the current system date and later than the date entered in the “From Date” field.

Eqp. Down Hrs.

The number of hours the equipment is down between the dates specified in the “From Date” and “To Date” fields (Decimal). Ensure that the down hours entered here are not negative. Also ensure that the down hours is not more than the number of hours between the dates entered in the “From Date” and the “To Date” fields.

Note: If the sum of the equipment down hours entered in all the rows in the multiline is greater than the down hours entered in the “Total Eqp Down Hrs.” field in the header, the system replaces the down hours entered in the header with the total of the down hours entered in the multiline.

Production Affected Down Hrs.

The number of hours during which the production was affected due to the equipment being down between the dates specified in the “From Date” and “To Date” fields (Decimal). Ensure that the down hours entered here are not negative. Also ensure that the down hours is not more than the number of hours between the dates entered in the “From Date” and the “To Date” fields.

Note: If the sum of the production affected down hours entered in all the rows in the multiline is greater than the down hours entered in the “Production Affected Down Hrs.” field in the header, the system replaces the down hours entered in the header with the total of the down hours entered in the multiline.

Comments

Any information to the equipment being down (Alphanumeric, 150).

The system displays the following fields in the “Record Statistics” group box:

Created By

The login ID of the user who created the work order.

Created Date

The date and time of the creation of the work order.

Last Modified By

The login ID of the user who modified the work order.

Last Modified Date

The date and time when the work order was last modified.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What you can do in this page

Update equipment down time

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Update equipment down time

You can update the details of down time of equipment or location in this page.

You can also record the equipment down time for a specific period in the “Eqp. Down Time” multiline.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recording down time of equipment – An overview

Report Equipment Down Time - A summary of the activity

This page allows you to record the down time of equipment or location, on which the work order selected from the main page was raised. You can also enter a work order directly in this page and record the down time of the equipment or location on which it was raised. You can record the number of hours the equipment was down as well as the number of hours the production was affected due to the equipment being down.

You can specify the total number of hours for which the equipment was down. Otherwise you can also specify the dates and the number of down hours of the equipment between the specific dates. You can also enter any comments pertaining to the down hours of the equipment.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisite