Skill Loading

Prerequisites

Unified Glossary

Basics of using a Ramco iEnterprise Series 4.0 Web Page

Using Online Help

This page allows you to view the work load as a percentage assigned to the skills. Tell me more.

The “Skill Loading” page appears.

Work Group

The work group for which you wish to view the loading of skills (Alphanumeric, 30). Ensure that the work group entered here belongs to the planning group specified in the “Planning Group” field. Data entry in this field is mandatory if you leave the “Planning Group” field blank.

 

Help facility available

 

Press <Enter>. The system retrieves the description of the work group alongside.

 

Zoom facility available

Planning Group

The planning group for which you wish to view the loading of the skills (Alphanumeric, 30). Data entry in this field is mandatory if you have not entered a work group in the “Work Group” field.

 

Help facility available

 

Press <Enter>. The system retrieves the description of the planning group alongside

 

Zoom facility available

Note: If you have entered a planning group and have not entered a work group, the system retrieves the loading of skills for all the work groups belonging to the planning group.

From (Day 1)

The date from which the work order is scheduled to start (Date Format). Data entry in this field is mandatory, if you have specified a work group or a planning group.

To

The date till which the work order is scheduled to complete (Date Format). Ensure that you enter a date later than the date entered in the “From (Day 1)” field.

Note: If you do not enter any date in this field, the system displays the loading details for 15 days starting from the date specified in the “From (Day 1)” field.

The system retrieves in the “% Loading” multiline, the skills belonging to the work group and/or planning group and the utilization of skills as a percentage for each day starting from the date entered in the “From (Day 1)” field till the date in the “To” field:

Skill

The skill belonging to the work group and/or planning group.

Day 1… Day 15

The percentage utilization of the skill on each day starting from the date specified in the “From (Day 1)” field till the date specified in the “To” field. The loading is calculated as follows:

 
  • The number of hours for which the skill is available for the day is assumed to be 24 hours.

 
  • The total number of hours for which the skill is actually assigned to the work orders is calculated.

 
  •  The loading is then calculated by the following formula:

 

Skill Loading = Assigned hours of the skill / Available Hours of the skill * 100

Skill Desc.

The description of the skill.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Viewing the loading of skills – An overview

Assignments - A summary of the activity

This page allows you to view the work load as a percentage assigned to the skills belonging to the work group that is responsible for carrying out the work order. You can view the workload of the skills for the period for which you wish to assign skills to the work order. The system also allows you to view the workload of the skills based on planning group. The system displays the skill loading for each day starting from the date that you have specified as the start date till the end date. If you have not specified any end date, the system displays the skill loading for fifteen days from the start date.

The system calculates the skill loading as follows:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisites