Risks
This tab allows you to capture the risk details such as the title, description, status, mitigation plan, initiated by, assigned to, etc., against the project code entered.
Select the Risks tab.
The Risks tab appears.
The system displays the following details in the "Risks" multiline:
|
Sl. No. |
The unique serial number identifying each row of the risks. |
Enter the following details in the "Risks" multiline:
|
Risk Title |
The title of the risk. (Alphanumeric, 70). |
|
Risk Desc. |
The descriptive information of the risk. (Alphanumeric, 150). |
|
Status |
Use the drop-down list box to select the status. The values Active, Postponed and Closed get populated. The system defaults the value Active as default on launch of the page. |
|
Mitigation Plan |
The mitigation plan of the risk (Alphanumeric, 4000). |
|
Initiated By |
The name of the person who had initiated the risk. (Alphanumeric, 60). |
|
Assigned To |
The name of the person to which the particular risk has been assigned. (Alphanumeric, 60). |
|
Due Date |
The due date of the risk. (Date Format). |
|
Due Time |
The due time of the risk. (Time Format). |
|
Priority |
Use the drop-down list box to select the priority. The values Low, Medium and High get populated. The system defaults the value Low as default on launch of the page. |
|
Category |
Use the drop-down list box to select the category. The values Category 1 and Category 2 get populated. The system defaults the value Category 1 as default on launch of the page. |
|
Contingency Plan |
The name of the contingency plan of the risk. (Alphanumeric, 4000). |
|
Probability (%) |
The probability of the risk in terms of percentage. (Numeric, 28). |
|
Cost |
The total cost of the risk. (Numeric, 28). |
Click the "Save" pushbutton to save the entered details.