Specify Issue List

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This page allows you specify the list of items that are to be issued to the subcontractor. Tell me more

The “Specify Issue List” appears on the screen

The system displays the following:   

SCR No.

A unique code identifying the Subcontract Request

Line No.

Use the drop-down list box to select the line number associated with an item.

BOM Code

Use the drop-down list box to select the unique code identifying the bill of material for the line item in the SCR. This defines all the constituent items and the outputs; their quantities required to manufacture and as an output of subcontracting some measured quanitity of the item. The drop-down lists “BOM Code” specified in the “Create Subcontract Request” page, if specified else lists all the “BOM Code” set for the item code-variant combination in the “ScBOM” component

The system displays the following:

Item Code

The unique code identifying the line item in the SCR

Variant Code

The variant of the item which gives standard specification details of the item

Desc.

The textual description of the subcontract item or the Item variant.

Required Qty.

 The number of units of the line item requested in the SCR.

UOM

The unit of measurement of the Subcontract item

Issue From

Use the drop-down list box to select the organizational unit from which the items are issued (Alphanumeric, 16)

Warehouse Code

The code identifying the warehouse from which the items are issued . This Warehouse should be one of the valid warehouses of the Issue From OU (Alphanumeric, 10)

 

Help facility available

Issue Date

The date on which the items are to be issued.(Date Format) Mandatory

Item Code

Code or identification number of the Issue item. (Alphanumeric, 32) Mandatory

 

Help facility available

Variant

The variant of the item of the issue list, (Alphanumeric, 8)

Issue Qty

The quantity of the item that is issued for the subcontract item is entered in this field. (Numeric) Mandatory if issue is yes. This should be positive for issuable items. This can be zero for non-issuable items.

UOM

The Unit Of measure in which the issue items are measured. (Alphanumeric, 10) Mandatory

 

Help facility available

Issue

Use the drop down box to specify whether you wish to issue the items or not.

 
  • Yes – Indicates that the item is a issuable input for the subcontract activity

 
  • No – indicates that the item is a non-issuable input for the subcontract activity

Issue From

Use the drop-down list box to select the organizational unit from which the item is issued.

Warehouse Code

The code identifying the warehouse from which the items are issued. This Warehouse should be one of the valid warehouses of the Issue From OU (Alphanumeric, 10)

 

Help facility available

Issue Date

The date on which the items are to be issued. (Date Format) . This cannot be earlier than the SCR date and SCR approval date.

 

Issue date = SCR approval date + Lead Time (in days) specified in BOM if the BOM code is referred to.

The system displays the following:

Item description

The description of the item is displayed in this field.

The issue item list is mapped to the SCR for the Subcontract Line Item.

The system updates the status of the document to “Fresh” if all the mandatory information is provided else the document status beocmes “Draft”.

The issue item list is mapped to the SCR

The system updates the status of the document to “Approved” if all the mandatory information is provided else the document status becomes  “Draft”

To proceed, carry out the following

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Specify Issue List – an Overview

Activity overview

The items issued are the materials that help in processing the subcontract line item. The page displays all the subcontract details such as the subcontract number, amendment number, and type of SCR. On giving the SCR line number, the system displays all the item details such as the item code, variant of the item, description of the item, the quantity of item requested from the supplier, the unit of measurement of the item in which it is subcontracted.

The bill of material code can be given if the line item in the SCR has the “BOM Reference” set to “yes”. On giving bill of material the issue list is defaulted in the issue list multiline. This can be modified based on the field settings, but it clears up the BOM reference in the main page.

For every issuable item you can specify the item code, variant code, the quantity of item to be issued, the unit of measurement of the item, the organization unit which is issuing the item, warehouse from which the item is issued, the date on which the item is issued and tolerance percentage of the issuable item.