Help On Planning No.
This page helps you to search and select the planning number for transferring the details to the field where it is required. You can specify the details of planning number, the date on which the planning is done, the project code and the location details of the requested vehicle/equipment. You can also specify the requestor details, the vehicle/equipment number and the requested type of vehicle/equipment. Based on the search criteria specified, the system retrieves the corresponding details in the multiline. The selected planning number with its details is transferred to the required page when it is confirmed.
Click the lens icon positioned next to the “Planning No.” field.
The “Help on Planning No.” page appears.
Enter the following details in the header:
|
Planning No. From |
The starting range of the planning number from which you wish to retrieve the plan details. |
|
Planning No. To |
The ending range of the planning number until which you wish to retrieve the plan details. |
|
Planning Status |
Use the drop-down list box to select the planning status by which you wish to retrieve the plan details. The combo is loaded with “Fresh”, “Confirmed”, “Under Amendment”, “Deleted” and “Cancelled”. The system displays “Blank” by default on launch of the page. |
|
Planning Date From |
The starting date of the planning from which you wish to retrieve the plan details. |
|
Planning Date To |
The ending date of the planning until which you wish to retrieve the plan details. |
|
Project Code |
The code identifying the project by which you wish to retrieve the plan details. |
|
From Location |
The starting range of the location from which you wish to retrieve the plan details. |
|
To Location |
The ending range of the location from which you wish to retrieve the plan details. |
|
Requestor |
The name of the requestor by which you wish to retrieve the plan details. |
|
Req. From Date |
The starting date of the request from which you wish to retrieve the plan details. |
|
Req. To Date |
The ending date of the request until which you wish to retrieve the plan details. |
|
Vehicle / Equipment No. |
The unique number of the vehicle / equipment by which you wish to retrieve the plan details. |
|
Request No. From |
The starting range of the request number from which you wish to retrieve the plan details. |
|
Request No. To |
The ending range of the request number until which you wish to retrieve the plan details. |
|
Type |
Use the drop-down list box to select the type by which you wish to retrieve the plan details. The combo is loaded with all the values defined in the “Maintain Codes” activity. The system displays “Blank” by default on launch of the page. |
Click the "Search" button to retrieve the search results in the multiline
The system displays the following details in the “Search Results” multiline.
|
Planning No. |
The number identifying the planning. |
|
Date |
The date on which the planning number is created. |
|
From Location |
The location from which the vehicle / equipment is requested. |
|
To Location |
The location until which the vehicle / equipment is requested. |
|
Requested Date |
The date on which the vehicle / equipment is requested. |
|
Requestor |
The name of the requestor. |
|
Project Code |
The code identifying the project. |
|
Vehicle / Equipment No. |
The unique number identifying the vehicle/equipment. |
|
Type |
The vehicle / equipment type as defined in the “Maintain Codes” activity. |
|
Request No. |
The requested number of the vehicle / equipment. |
|
Planning Status |
The status of the planning number. The status can be “Fresh” or “Confirmed” or “Under Amendment” or “Deleted” or “Cancelled”. |
Check the box in the “Select” column of the multiline to select the required planning number.
Click the “OK” pushbutton.
The system transfers the selected planning number and its details to the required page.