View Component Revision

Activity overview

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This page allows you to view the components under revision. The engineering change requests for which the details are to be viewed are retrieved by the system from the calling page. For the request displayed, the system also retrieves the corresponding component details in the multiline. Further, you can also view the process plan and implementation details of the engineering change request.

The “View Component Revision” page appears.

The system displays the following:

ECR No.

The number identifying the engineering change request.

ECR Desc.

The description of the engineering change request.

 

Zoom facility available.

ECR Status

The status of the engineering change request. It can be "Active", "Inactive",  "Authorized", "Resolved" or "Implemented".

EC Need Date

The date on which the engineering change is required to be implemented.

ECR Type

The type of the engineering change request. It can be "Engineering", "Production", "Subcontracting" or "All".

Item Revision No.

The revision number identifying the item variant.

Item Code

The code identifying the item.

Variant Code

The code or number identifying the variant of the item.

Current Short Desc.

The current short description of the item variant specified.

 

Zoom facility available.

The system displays the following details in the “Component Details” multiline:

Item Code

The code identifying the component item.

Variant Code

The code or number identifying the variant of the component item.

Item Rev. No.

The revision number of the component item specified.

Current Short Desc.

The current short description of the item variant specified.

Action

The action types based on which the components are updated in product structure. It can be "Add", "Delete", "Replace" or "blank".

Replacing Item Code

The code identifying the replacing component item.

Replacing Variant Code

The code or number identifying the replacing variant of the component item.

Replacing Item Desc.

The description of the replacing component item.

Effective  From

The date from which the component item is valid.

Effective  To

The date to which the component item is valid.

Use-Up WIP / Inventory

The usage option specified for the component item.

Use-up Date From

The date from which the existing component item is valid.

Use-up Date To

The date till which the existing component item is valid.

PS Seq.

The number identifying the position sequence of the component item in the product structure.

Qty. Setup

The quantity of the component item during setup sub-activity.

Qty. Batch

The quantity of the component item during batch sub-activity.

Run Qty.

The quantity of the component item during run sub-activity.

UOM

The production unit of measure of the component item.

Plant

The plant where the component item is identified or defined .

Warehouse Code

The code or number identifying the warehouse where the component item is identified.

Comp Yield%

The percentage yield of the component item.

To proceed, carry out the following

The system displays the following:

Created By

The login ID of the user who created the component revision.

Created Date

The date on which the component revision was created.

Edited By

The login ID of the user who has modified the component revision.

Edited Date

The date on which the component revision was modified.