This page allows you to view the components under revision. The engineering change requests for which the details are to be viewed are retrieved by the system from the calling page. For the request displayed, the system also retrieves the corresponding component details in the multiline. Further, you can also view the process plan and implementation details of the engineering change request.
Select the “View Component Revision” link at the bottom of the page.
The “View Component Revision” page appears.
The system displays the following:
ECR No. |
The number identifying the engineering change request. |
ECR Desc. |
The description of the engineering change request. |
Zoom facility available. |
|
ECR Status |
The status of the engineering change request. It can be "Active", "Inactive", "Authorized", "Resolved" or "Implemented". |
EC Need Date |
The date on which the engineering change is required to be implemented. |
ECR Type |
The type of the engineering change request. It can be "Engineering", "Production", "Subcontracting" or "All". |
Item Revision No. |
The revision number identifying the item variant. |
Item Code |
The code identifying the item. |
Variant Code |
The code or number identifying the variant of the item. |
Current Short Desc. |
The current short description of the item variant specified. |
Zoom facility available. |
The system displays the following details in the “Component Details” multiline:
Item Code |
The code identifying the component item. |
Variant Code |
The code or number identifying the variant of the component item. |
Item Rev. No. |
The revision number of the component item specified. |
Current Short Desc. |
The current short description of the item variant specified. |
Action |
The action types based on which the components are updated in product structure. It can be "Add", "Delete", "Replace" or "blank". |
Replacing Item Code |
The code identifying the replacing component item. |
Replacing Variant Code |
The code or number identifying the replacing variant of the component item. |
Replacing Item Desc. |
The description of the replacing component item. |
Effective From |
The date from which the component item is valid. |
Effective To |
The date to which the component item is valid. |
Use-Up WIP / Inventory |
The usage option specified for the component item. |
Use-up Date From |
The date from which the existing component item is valid. |
Use-up Date To |
The date till which the existing component item is valid. |
PS Seq. |
The number identifying the position sequence of the component item in the product structure. |
Qty. Setup |
The quantity of the component item during setup sub-activity. |
Qty. Batch |
The quantity of the component item during batch sub-activity. |
Run Qty. |
The quantity of the component item during run sub-activity. |
UOM |
The production unit of measure of the component item. |
Plant |
The plant where the component item is identified or defined . |
Warehouse Code |
The code or number identifying the warehouse where the component item is identified. |
Comp Yield% |
The percentage yield of the component item. |
To proceed, carry out the following
Select the “View Process Revision” link at the bottom of the page to modify the process Plan revision details.
Select the “View Implement Engineering Change” link at the bottom of the page to implement the engineering changes.
The system displays the following:
Created By |
The login ID of the user who created the component revision. |
Created Date |
The date on which the component revision was created. |
Edited By |
The login ID of the user who has modified the component revision. |
Edited Date |
The date on which the component revision was modified. |