Close Work Order

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This activity allows you to close a work order. Tell me more

The “Close Work Order” page appears.

Work Order No.

The number identifying the work order to be closed.

Rep. Schedule No

The number identifying the repetitive schedule for which the work order is closed. If the repetitive schedule is not left blank, then the system retrieves all the repetitive schedule orders from the work order header.

Matl. / Prod. Controller

Use the drop-down list box to select the material or production controllers defined in the control unit for which the login user has “Transaction” access permission. The system retrieves the values in ascending order. The login control unit permission has to be populated from the user permissions defined under the “Organization Model” business component. If material or production controller is left blank, then the system retrieves only those orders whose production controller is one of the production control units for which the user has "Transaction" permission.

Item Code

The code identifying the item for which the work order is closed. 

Variant Code

The variant code of the item for which the work order is closed. 

Problem

Use the drop-down list box to select the problems associated to the work order. You can select from “No Problem”, “Material Problem”, “Capacity Problem”, “Capacity/Material”, “EC Problem”, “Order in Past date”, “Other Problems” or “Blank record”. The system displays “Blank” by default on launch of the page. If the problem is not left blank, then the system retrieves the work orders for the selected problem from work order header. The options available are:

 

  • 0 – No Problem” – indicates that there is no problem associated with the work order.

 

  • 7 – Material Problem” – indicates that the input material required for completion of the work order is not available.

 

  • “8 – Capacity Problem” – indicates that the capacity of the resource is less than what is required for the completion of the work order.

 

  • “9 – Matl & Cap. Problem” – indicates that both material and capacity problem exists.

 

  • “E – Engineering Change Problem” – indicates that the problem exists because of the engineering change that is implemented.

 

  • “P – Order in Past date” – indicates the work order has past the due date.

 

  • “Z – Other Problems” – indicates the other problems associated with the work order.

Seq. Rule Code

Use the drop-down list box to select the sequence rule codes along with a blank record for which the work order is closed. The system populates the queries saved for the login user. This field will be used for search criteria. The system displays “Blank” by default on launch of the page. If the sequence rule code is not left blank, then the system retrieves the work orders as per the conditions from the work order header.

Status

Use the drop-down list box to select the logical operators used to combine with the status. You can select from “=”, “! =”, “>”, “>=”, “<”, “<=” Or “Blank”. The system displays “Blank” by default on launch of the page. Use the drop-down list box provided alongside to select the status of the work order. You can select from “All”, “Released", “Order/acty started" or “Order/acty breakdown”. “Order/acty finished” or “Acty short closed”. If the status is not left blank, then the system retrieves the work orders for the selected status from the work order header.

Order Category

Use the drop-down list box to select the order category. You can select from “MRP Order Stk Item”, “Rep Schedule Order”, “Unplanned Order”, “Rework Order” or “Blank”. The system displays “Blank” by default on launch of the page. If the order category is not left blank, then the system retrieves the work orders for the selected order category from the work order header.

Sale Order No.

The number identifying the sale order for which the work order is closed

 

Help facility available.

Customer Code

The code identifying the customer whose work order is to be closed.

 

Help facility available.

The system checks whether the Close Work Order screen is called from any other screen. If it is called from any screen, then for the search criteria combination subscribed from the parent screen, the system retrieves the corresponding order details in the multiline. The details are retrieved using the “Like” operator for each of the specified values in each control or “ Or” operator between two or more controls, if more than one control is specified.

The following conditions are checked by the system:

Short Close Work Order

Select the checkbox to indicate whether the work order is short closed or not. The system leaves the box “Unchecked” by default on launch of the page.

Save Template

Select the check box to save the details of the search criteria with the values specified in the current transaction to be displayed when the user revisits the screen. The system leaves the box “Unchecked” by default on launch of the page. If this field is “Checked”, then the system saves the header details for the login user.

Execute Online

Select the check box to indicate whether the work order is closed immediately or during next MRP run. The system leaves the box “Unchecked” by default on launch of the page.

The system displays the following in the “Work Order Details” multiline:

Work Order No.

The number identifying the work order being closed.

Item Code

The code identifying the item of the work order being closed.

Variant Code

The variant of the item of the work order being closed.

Desc.

The description in the combination of item/item variant.

Receipt Qty.

The receipt quantity of the item that is to be produced based on the requirements or demands.

Start Date

The date on which the work order has to be started.

Due Date

The date on which the work order has to be completed.

Status

The status of the work order.

Problem

The problems related to the items and resources.

Sale Order No.

The number identifying the sale order created for a customer.

Order Category

The order category of the work order.

Order Priority

The priority in which the orders are scheduled. The priority could be between “1” – “5”.

Warehouse Code

The code or number identifying the warehouse where the work order is created for the item.

Plant

The plant where the work order is created for the item.

Order Qty.

The quantity of the work order. This is the sum of the receipt quantity and scrap quantity.

Scrap Qty.

The expected scrap quantity of the output item of the work order. This is calculated based on the receipt quantity of the work order.

UOM

The production unit of measure of the item.

Purpose

The purpose defined in the control unit.

Item Rev. No.

The current revision number of the item. This field is displayed only if the item is under Engineering Change Control.

Planned Due

The expected due date of the work order.

PP Desc.

The description of the process plan.

PS Desc .

The description of the product structure.

Customer Name

The name of the customer as referred in the sale order.

Project

The name of the project as defined in MAC (Management Accounting Module) against which a work order can be generated.

Remarks

The remark or comment specified by the user.

Issued

Indicates whether the material required for the work order is issued.

Field1

The remark or comment specified by the user.

Field2

The remark or comment specified by the user.

Field3

The remark or comment specified by the user.

The system checks whether the short close work order field is “Checked”:

4 If it is checked, then the status of the work order is also checked. If the status of the work order is greater than or equal to “Order or Activity finished”, then the system displays an error message as the order has already been short closed or the order is only for closure and not for short closure.

The system checks whether the short close work order field is “Unchecked”:

The system ensures that at least one record in the multiline has been selected and the work order should not be in “Hold” status

To proceed, carry out the following