This activity allows you to set the parameters for the “Shop Floor Control” business component. Parameter values set will influence the behaviour of the transactions in the component. All the default plants for the components are populated. Parameters are set for each plant. By default, first plant and corresponding component parameters are displayed.
Based on the parameter set, the changes to the component are updated. If these parameters are modified as per subsequent business requirements the existing parameters are modified and saved.
Select the “Component Parameters” link under the “Shop Floor Control” business component.
The “Component Parameters” page appears.
Enter the following details:
|
Plant |
Use the drop-down list box to select the. Load all the plants (Organization Unit). The system retrieves the values from the “CIM Model” business component along with a blank row. The system displays “First Plant” by default on launch of the page. If the parameter details are already saved against the plant then the system retrieves those details. Otherwise, the system retrieves the details for the selected plant. |
Click the “Get” pushbutton to retrieve the parameter details.
Enter the following in the “Parameter Details” group box:
|
Item Scrap Option During Production Reporting |
Use the drop-down list box to select the scrap items considered during production reporting. The option available is “Write Off”. The system displays “Write off” by default on launch of the page. |
|
|
|
Employee Code Mandatory For Reporting |
Use the drop-down list box to select the employee codes that are mandatory for reporting. You can select from “Yes” or “No”. The system displays “No” by default on launch of the page. The options available are |
|
|
|
|
|
Control For Start Of Work Order Activity Without Matl. Issue |
Use the drop-down list box to specify the start of the work order activity without material issue. The system displays “No Control” by default on launch of the page. The options available are |
|
|
|
|
|
|
|
|
|
Control For Qty. Reported In Activities |
Use the drop-down list box to select the quantity reported in activities. The system displays “In Sequence” by default on launch of the page. The options available are |
|
|
|
|
|
Allow Reporting On Non Working Times |
Use the drop-down list box to select the options that allow reporting on non-working times. The system displays “Yes” by default on launch of the page. The options available are |
|
|
|
|
|
Resource / Labor Reporting Basis |
Use the drop-down list box to select the resource/labor reporting basis. The system displays “Duration” by default on launch of the page. The options available are |
|
|
|
|
|
Allow Over Run During Production Reporting |
Use the drop-down list box to select the options to allow over-run during production reporting. The system displays “No” by default on launch of the page. The options available are |
|
|
|
|
|
Maintain Activity Packing During Rescheduling |
Use the drop-down list box to select the options to maintain the activity packing during re-scheduling. The system displays “Yes” by default on launch of the page. The options available are |
|
|
|
|
|
Rescheduling During Production Reporting |
Use the drop-down list box to select the options for re-scheduling during production reporting. The system displays “None” by default on launch of the page. The options available are |
|
|
|
|
|
|
|
Allow Rejection Of Serial Controlled Items At Intermediate Activities |
Use the drop-down list box to select the options to allow rejection of serial controlled items at intermediate activities. The system displays “Yes” by default on launch of the page. The options available are |
|
|
|
|
|
Recalculate Downstream Activity Duration Based On Prod. Rep. |
Use the drop-down list box to select the options to re-calculate the downstream activity duration based on production reporting. The system displays “Yes” by default on launch of the page. The options available are |
|
|
|
|
|
Default Confirm Consumption |
Use the drop-down list box to specify the default confirm consumption. The system displays “Yes” by default on launch of the page. The options available are |
|
|
|
|
|
Allow Addition Of Items In Consumption Reporting |
Use the drop-down list box to select the options to allow addition of items in consumption reporting. The system displays “Yes” by default on launch of the page. The options available are |
|
|
|
|
|
Serial Assignment in Consumption Reporting |
Use the drop-down list box to select the options that indicates serial assignment in consumption reporting. The system displays “Manual Assignment” by default on launch of the page. The options available are |
|
|
|
|
|
Implement Lot Traceability For Items |
Use the drop-down list box to select the options to implement the lot traceability for items. The system displays “No” by default on launch of the page. The options available are |
|
|
|
|
|
Default Consumption Qty. With Issued Qty. |
Use the drop-down list box to select options to indicate default consumption with issued quantity. The system displays “Yes” by default on launch of the page. The options available are |
|
|
|
Click the “Set Parameters” pushbutton to save the defined parameters.
The system saves the parameters against the plant.