This page allows you to view the material that is specified for carrying out the plan. Tell me more.
Select the “View Material Planning” link at the bottom of the “View Maintenance Plan” page.
The “View Material Planning” page appears.
The system displays the following fields:
Plan No. |
The plan for which the material that is planned must be viewed. |
The description of the plan is displayed alongside. | |
Zoom facility available | |
Plan Sch. Start Date |
The date on which the plan is scheduled to start. |
Sch. Compl. Date |
The date on which the plan is scheduled to end. |
Est. Cost |
The cost estimated for carrying out the plan. |
Est. Duration (Hrs.) |
The number of hours required for the completion of the plan. |
The system displays the following fields in the “Spares and Consumables” multiline:
Item Code |
The item that is required for carrying out the plan. |
Variant |
The variant of the item. |
Desc. |
The description of the spare part. |
UOM |
The unit of measurement of the spare part. |
Qty. |
The number of spare parts required for carrying out the plan. |
Cost / Unit |
The cost per unit of utilizing the spare part. |
Warehouse |
The warehouse of the spare part. |
Item Status |
The status of the item, which can be “Accepted”, “Rejected”, “Held”, “Hard allocated”, “In-transit”, “Consignment – In”, “Consignment – out”, “Quarantine”, “Bill and Hold” or “Conditionally accepted”. |
Est. Cost |
The cost of utilizing the spare part. |
The system displays the following fields in the “Record Statistics” group box:
Created By |
The login ID of the user who created the plan. |
Created Date |
The date and time at which the plan was created. |
Last Modified By |
The login ID of the user who last modified the plan. |
Last Modified Date |
The date and time at which the plan was last modified. |
To proceed, carry out the following
Select the “View Service Details” link at the bottom of the page to view the service details that are required for carrying out the plan.
Select the “View Part Availability” link at the bottom of the page to view the details of the spare parts that are required for carrying out the plan.
Viewing the material planned for carrying out the plan – An overview
This page allows you to view the material that is specified for carrying out the plan. You can view the following details of the material that is planned:
The spare part that is utilized for carrying out the plan
The variant of the spare part
The description and the unit of measurement of the spare part
The number of spare parts required for carrying out the plan
The cost per unit of the spare part
The warehouse of the standard spare part
The estimated cost of the spare part
Any other information about the spare part