<<

Hangar
Hangers
Hard Allocation Required
Heating
    up.”
Help on Scheme
Hence ATA 21
Him/her
    allocated
Hold
    Period
Holiday Master
Hours
    Flying
Hours Due
    Flying
HR Set Up
HR Set Up Unit
Human Resource Management Process
Hyd Oil Uplifted
Hydraulic Oil Uplifted
Hyperlink
Hyperlinked
    Select
Hyperlinks



IATA
ICAO
ID
   Maintain Sanction - entry page
   Unified Glossary
   Maintain Scheme - entry page
Identifying
    inter-warehouse
    Type Certificate
    Unit
IDs
In-house
In-House Repairable
Incident / Accident Type
Including
    Dependent Status
INCO
INCO Term
Incoming
    Serial
Incomplete – When
Indefinite
Indicated Air Speed
Indicates
Induction Date
Influence
Informational
Initial Monthly Reliability Alert
Initial Reliability Alert
Insert Record
Inspected By
Inspected Date
Inspection
Inspection Cost Reimbursement
Inspection Qty
Inspection Type
Inspection/testing
Inspector
Installation Date
Installation Time
Installed By
Installed Comp
Insurance Amount
Insurance By
Insurance Liability
Insurance Terms
Inter-warehouse
    identifying
Interchangeability
Interchangeable
Interchangeable Part
Internal
Internal – Indicates
Internal”
International Air Transport Association Number
International Civil Aviation Organization Number
International Commercial Term
International Organization
    Standardization
Interval Value
Intra-warehouse
Inventory
Inventory Item
Invoice Matching
Invoicing
    Org
In–Situ
IPC
ISO
ISO Currency Code
Issue Date
Issue Part
Issue Qty
    Pending
Issue Warehouse
Issued Quantity
Issued Serial
Issuing
    CoM



Job Classification
Job Information
    part
Job Source
Job Status
Job Type
Joining
    Date
Journey Log
Journey Start Date
Junior Management



K
    values
Kg / Hour
Kit Part
Kit”



Labor Cost
Land
    Date
    Time
Land codes
Land Master
Last Forecast
Last Generated No
Last In First Out
Last Modified By
   Maintain Sanction - entry page
   Unified Glossary
   Maintain Scheme - entry page
Last Modified Date
   Maintain Sanction - entry page
   Unified Glossary
   Maintain Scheme - entry page
Last Performed Date
Last Record
Launch Date
Lead Time
Lead Time Units
Lease Type
Level
Level Code
License Category
Life
    Remaining
Life Parameter
LIFO
Limit Type
Line Item Cost
Line Item Value
Link Flag
Listing
    FAA-approved
Loan
Loan – Indicates
Location
    Ordering
    Requesting
Log Book
Login
   Maintain Sanction - entry page
   Basics of using a Ramco Enterprise Series web page
   Unified Glossary
   Maintain Scheme - entry page
    belonging
Logout
Lot
Lot & Serial Controlled
Lot Controlled
Lot No Controlled
Lot No Type Num
Lot Quantity
Lot Quarantined Qty



Maint Report
Maintain Sanction
Maintain sanction IDs
Maintain Scheme
Maintain scheme details
Maintenance
Maintenance Base
Maintenance Change Request
    type
Maintenance Change Request Class
Maintenance Change Request Document Type
Maintenance Change Request Number
Maintenance Implications
Maintenance Issue Transaction
Maintenance Planning Document
Maintenance Planning Document Tasks
Maintenance Process
Maintenance Program
Maintenance Type
Managers
Mandatory
Manual – The
Manufacture
Manufacturer
    NATO Supply Code
Manufacturer Code
Manufacturer Lot
Manufacturer Part Number
Manufacturer Parts
Manufacturer Serial
Manufacturer Sl No
Map
    Status
Marital Status
Master
    Science
Matching
    Type
Material
Material Controller
Material Cost
Material Request
Material Specification
Matl Return Authority
Max Remaining Life
Maximum Limit
Maximum OT Hours/Week
Maximum Reimbursement
Maximum Zone
MCM
MCR Class
MCR Doc Type
MCR Issue Date
MCR Part
MCRs
    existing
    regarding
    Terminating
    type
Mean Time Between Failures
Mean Time Between Unscheduled Removals
Measurement
Mechanic
MEL
MEL Category
MEL item
MEL Quantity
Method
    Packaging
    Shipping
Middle Management
Min-Max
Minimum Equipment List
Minimum Equipment List Quantity
Minimum Limit
Minimum Lot
Minimum Order Qty
Minimum Remaining Life
Minimum Shelf Life
Minimum Zone
Mod Status
MOD Tasks
Model Configuration
    Updating
Modification Committee Meeting Number
Modified Part Applicability
Modify
   Maintain Sanction - entry page
   Maintain Scheme - entry page
    Sanction
    Scheme
Monthly Reliability Alert
    ATA System
    Component
Months
Moved Qty
Moving
    Average
MPD Tasks
MPDs
MR
MR Class
MR Priority
MR Type
MSG-3
MSN
    gives
MTBF
MTBR
MTBUR
    terms
Multiline
   Maintain Sanction - entry page
   Help on Scheme
   Basics of using a Ramco Enterprise Series web page
   Unified Glossary
   Maintain Scheme - entry page
    Adding
    Deleting
    existing
    number
    set
Multiple – Indicates



N
N1
N1 Vib
N2
N2 Vib
Name
    Original Equipment Manufacturer
NATO
NATO Supply Code
    Manufacturer
NAVAIDS
Navigational Aids
    Tactical Air Navigation Channel
Nearing
    expiry
Negative Tolerance
Net Quantity
Nettable
New
New Config
New Revision Type
Newly Overhauled
Next Empty Storage
Next Higher Assembly
    changing
Next Record
NHA
NHA Component
NHA Part
Non-availability
Non-Routine Task
None
None – Indicates
Normal Storage Type
Normal Zone Type
Normal – Material
Normal – The
Normal – When
Not Applicable
NSCM
NT
Numbering
   Maintain Sanction - entry page
   Basics of using a Ramco Enterprise Series web page
   Unified Glossary
   Maintain Scheme - entry page
    APUs
    multiline
    Packs
    Type
       Maintain Sanction - entry page
       Unified Glossary
       Maintain Scheme - entry page
    Units
Numeric
Numeric ISO Currency Code


>>