View RCCP Exceptions

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This activity allows you to view the exceptions defined for the rough-cut capacity plan. Tell me more

The “View RCCP Exceptions” page appears.

Plg. Group

The code identifying the planning group. If the planning groups and items are specified, the system displays an error message. If the planning group is specified, it should exist in the planning group master for the login Business Unit from “Item Administration” business component and should be in “Active” status. Otherwise, the system displays an error message. The system retrieves validity dates and the material planner for the specified planning group from the “Item Administration” business component. The planning group field is mandatory and it should be valid on the current date..

 

Help facility available.

The system displays the following:

Desc.

The description of the planning group. If the planning group is specified, then the system retrieves the planning group description from the “Item Administration” business component.

 

Zoom facility available.

Item

The code identifying the item. If the items and planning groups are specified, then the system displays an error message. If the item code is specified, then it should be in “Active” status. The item code should be valid on the current date.

 

Press <enter> key.

 

The item code should not be left blank. If it is left blank, then the system displays an error message. If the item and the variant are specified, then the system checks for the existence of the item and variant in the item master for the Organization Unit from the “Item Administration” business component. The system also checks the specified item and variant is planned at MPS level from “Item Administration” business component. If the item and variant does not exist and is not planned, then the system displays an error message. The system also retrieves the validity dates and material planner. If the item code is not valid on the current date, then the system displays an error message.

 

Help facility available.

Variant Code

The code or number identifying the variant of the item.

 

Press <enter> key.

 

The variant code should not be left blank. If it is left blank, then the system displays an error message. If the item and the variant are specified, then the system checks for the existence of the item and variant in the item master for the Organization Unit from the “Item Administration” business component. The system also checks the specified item and variant is planned at MPS level from “Item Administration” business component. If the item and variants does not exist and is not planned, then the system displays an error message. The system also retrieves the validity dates and material planner. If the item code is not valid on the current date, then the system displays an error message.

The system displays the following:

Desc.

The description for the combination of item/item variant. If the item code and variant is specified, then the system retrieves the description from “Item Administration” business component.

 

Zoom facility available.

From Date

The date from which the rough-cut capacity plans exception details can be viewed. If the date is not specified then the system defaults from date based on the save template field. Otherwise, the system sets the default value as the current system date. This date should be less than or equal to the To date.

To Date

The date till which the rough-cut capacity plans exception details can be viewed. If the date is not specified then the system defaults from date based on the save template field. Otherwise, the system sets the default value to end date of the planning horizon i.e. the MPS horizon.

Matl. / Prodn.  Planner

Use the drop-down list box to select the material or production planners defined in the control unit for which the login user has “View” access permission The system retrieves the control units in the ascending order. The system default the material or production planner based on the save template field or based on the default specified in the “User Permission” page. Otherwise, displays the “First Available Value” by default on launch of the page.

% Over Load

The over load percentage of the resource. The percentage by which the required capacity is greater than the available capacity. The system defaults the over load % based on the save template field for the login user. Otherwise, defaults it from the “Component Parameter” page.

% Under Load

The under load percentage of the resource. The percentage by which the required capacity is less than the available capacity. The system defaults the under load % based on the save template field for the login user. Otherwise, defaults it from the “Component Parameter” page.

Save Template

Select the check box to save the values in the search criteria with the values specified in the current transaction to be displayed when the user revisits the screen. The system leaves the box “Unchecked” by default on launch of the page. If the save template field is checked then the system saves the search criteria details for the login user.

The system retrieves the RCCP exception details for the item code/planning group. If the record does not exists for the above combination then the system displays an error message.

The system displays the following in the “Capacity Details” multiline:

Resource No.

The id identifying the resource. If the planning group/item variant is specified, the system retrieves the resources from Bill of Resources of the “Process Model“ business component. If the planning group/item is not specified, then the system retrieves the resource details from bill of resources of those items for the selected material or production planner. If the material or production planner is not selected, then the system retrieves the resources based on the Bill of Resources for all the MPS items for which the login user is the material/production planner.

Desc.

The description of the resource. The system retrieves the description for each resource whether under loaded or over loaded.

UOM

The production unit of measure of the item. The system also retrieves the UOM for each resource whether under loaded or over loaded.

Period

The period for which the resources are over loaded or under loaded. If the item is specified, then the system retrieves the MPS period defined for the item from “Item Administration” business component. If the planning group is specified, then the system retrieves the MPS period defined for the planning group from “Item Administration” business component. If the resource is specified, then the planning bucket of the resource is taken as the period. Otherwise, the system retrieves the default MPS period defined in the “Component Parameter” page. The system splits the From date and To date into equal number of intervals by the above retrieved MPS period. The system then retrieves the End date for each split intervals as period.

Note: The summing of data is based on these periods identified.

The system displays the following in the “Capacity Details” multiline:

% Under Load

The under load percentage of the resource. The percentage by which the resource is under loaded than the available capacity.

% Over Load

The over load percentage of the resource. The percentage by which the resource is over loaded than the available capacity.

Note: The system calculates the available capacity as (calendar event duration in hrs * bucket factor * resource capacity * resource efficiency) summed up for all the calendar events for the period.

To proceed, carry out the following