This page allows you to create activity time type. Tell me more
Select the “Create Activity Cost Details” link under the “Process Model” business component.
The “Create Activity Cost Details” page appears.
Enter the following fields:
Activity Timetype |
The unique code identifying the activity time type entered manually. Mandatory. |
Click the “Get” pushbutton to retrieve the existing activity time type details.
Desc. |
The description of the activity time type. |
Zoom facility available. |
|
Status |
Use the drop-down list box to select the status of the activity time type. Mandatory. The system displays “Active” by default on launch of the page. The options available are |
|
|
|
|
|
Note: The status can be modified through the “Edit Activity Cost Details” screen.
Time Setup Flag |
Select this flag/checkbox if the activity time type must represent the setup sub-activity. |
Time Batch Flag |
Select this flag/checkbox if the activity time type must represent the Batch sub-activity. |
Run Time Flag |
Select this flag/checkbox if the activity time type must represent the run sub-activity. |
Note: You can select either one flag or the combination of the three flags in the header.
Maintained By |
Use the drop-down list box to select the “Maintained By” control units for which the login user has “View” access permissions. The system displays the “Default Maintained By” defined for the login user. Otherwise, the system displays the first value as the default value. |
Enter the following fields in the “Cost Details” multiline:
Cost Element |
The number identifying the cost element defined under the cost center. The cost element should not be duplicated. |
Press <Enter> key. |
|
The cost element should be valid and should be in “Active” status. The system retrieves the cost element description from the “Cset” business component. |
|
Help facility available. |
The system displays the following in the “Cost Details” multiline:
Desc. |
The description of the cost element. |
Note: If help on cost element is taken, the description gets fetched automatically in the “Cost Details” multiline.
Check the box in the “Select” column to select the cost element for modifying its details.
Click the “Create Activity Cost Details” pushbutton to create the activity cost details.
The system ensures that the login user should have “All” access permission for the "Maintained by" control units of the activity time type. The system checks the status of the activity time type. If the status is set to “Draft” then the system saves the details with status as “Draft” without any other validations. The activity time type cannot be created in “Inactive” status. The system checks that at least one sub-activity should be selected. The system saves the activity time type details.
The login user ID and the system date are updated in the “Created By” and “Created Date” fields.
To proceed, carry out the following
Select the “Edit Activity Cost Details” link at the bottom of the page to modify activity cost details.
The system displays the following:
Created By |
The login user ID of the person who has created the activity cost details. |
Created Date |
The date on which the activity cost details was created. |
Create Activity Cost Details – An overview
The activity time type indicates the type of the sub-activity (setup, batch and run). Activity time types are mapped to the cost element and this link is used for calculating the cost estimates of activities. For example, "Mill-Set" can be an activity time type that can describe the setup sub-activity of the milling activity. Activity time types are used in costing of work orders and production cost estimates.
You can attach a particular activity time type to a sub-activity by selecting the appropriate time flags. You can select either of the sub-activity time flags or the combination of all. You can initiate a link between the activity time type and the cost element to identify the costs associated with the sub-activity. You can make use of the help facility to select the relevant cost element defined under the cost center to attach it to the activity time type. On defining the necessary fields, you can create the activity time type.
Optional
Maintained By should have been defined in the “Create Control Unit” activity of the “Organisation Model” business component.
Cost Element should have been defined in the “Create Cost Element” activity of the “Cost Setup” business component.