Change Status - Subcontract Request

Activity overview

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This page allows you to modify or change the status of the subcontract request document. The editable fields in this page are the "Change Status To","Reason Code" and  "Description" field. You can use the drop down list box to change the status of the subcontract request document. The system lists "Hold" or "Release" as the status. You can put the document in hold or release status based on the requirement. You can also select the reason code which is associated with the status change. The Description associated with the reason code can be entered in this page.

The “Change Status - Subcontract Request” page appears.

The System displays the status of the Subcontract Request

The system displays the following in the “Subcontract Request Details” group box

SCR No.

The Unique code identifying the SCR.

SCR Date

The date on which the subcontract Request was raised.

Type

The type of Subcontract Request is displayed in this field, which can be “Service” or “Conversion”.

Requester ID

The Unique identification number of the requester who wants certain items to be subcontracted.

Mode

The Mode of the SCR is displayed which can be “Normal” or “Express”.

SCR Value

The sum of all the line items total value is displayed in this field.

Origin

The application from which the SCR originates is displayed.

Folder

The folder to which the SCR belongs to is displayed.

Quotation Needed

This box appears checked or unchecked if quotation is expected or not from the subcontractor.

Order At

The name of the OU in which the order is placed is displayed.

Receipt At

The OU in which the items after subcontracting will be received is displayed.

Approved Date

The Date on which the approval of the SCR document was made.

Change Status To

Use the drop down list box to select the new status for the SCR document. It can Held or Release. In case of latter it changes back to the status from which it was held.

The system displays the following:

Remarks

Any  remarks pertaining to the SCR are displayed.

Reason Code

Code or identifier associated with the reason for changing the status.

 

Help Facility Available

Description

The textual description associated with the reason code stating the reason for changing the status.

The system displays the following in the “Item Details” multiline:

SCR Line No.

The Unique identification number of the line associated with the item.

Item Code

Code or identification number of the item. This appears as a hyperlink and can be accessed to view item related details.

Variant

The name of the variant associated with the item.

Desc.

The description of the item and the variant or Non Codified item in case of Adhoc Item Class drop down having the value “None”.

BOM Reqd

“Yes” or “No” gets displayed in this field stating that Bill Of Material (BOM) is required  or not for the subcontract item

BOM Reference

The unique code identifying the Billing of Materials for the item to be subcontracted.

Quantity

The quantity of item  to be subcontracted of the subcontract item.

UOM

The Unit Of Measure in which the subcontract items are measured.

Cost

The unit cost of subcontracting the item (Numeric). This cannot be blank or less than or equal to zero.

Per

The number of items, which form a unit.

Schedule Type

“Single” or “Staggered” is displayed in this field.

Need Date

The date on which the items needs to be supplied by the supplier.

Budget ID

A unique code identifying the budget under in which the item falls. This appears as a hyperlink and can be accessed to view budget related details.

Warehouse

The code identifying the warehouse where the item needs to be stored on receipt. This appears as a hyperlink and can be accessed to view warehouse related details.

Supplier Code

Code or identification number of the supplier. This appears as a hyperlink and can be accessed to view supplier related details.

Name

Name of the supplier associated with the supplier code.

Preferred Supplier Code

Code or identifier of the supplier who is categorized as a preferred supplier. This appears as a hyperlink and can be accessed to view the details associated with the preferred supplier.

Preferred Supplier’s Name

Name of the preferred supplier associated with the code.

Drg Revision No

The Identification number of the revisions done to the engineering drawing.

Ref. Doc. Type

Use the drop-down list box to select the type of the reference document.

Ref.  Doc.  No.

The Unique code identifying the reference document that is referred in the SCR.

Ref.  Doc. Line No.

The Unique code of the line associated the reference document to which the SCR line item refers.

Adhoc Item Class

The Non codified item class associated with the item description is displayed. If it has a value other than “None” then Item Code and Variant are to be Blank.

The system displays the following:

Created By

The Name of the user who created the SCR

Created Date

The date on which the SCR was created.

Last Modified By

The name of the person who last modified the SCR

Last Modified Date

The date on which the SCR was last modified

To proceed, carry out the following