Prerequisites

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This activity allows you to create a planning order for the selected planning group. Tell me more

The “Create Planning Order” page appears.

Plg. Group

The unique code that identifies the planning group for which a planning order is to be created. Mandatory. Planning group refers to an artificial set of items that have almost similar characteristics and planning parameters, used to facilitate master production scheduling and material planning.

 

Press <Enter> key.

 

The system checks whether planning group is left blank. If yes, it displays an error message. The system also checks for the existence of the planning group in the planning group master and whether the planning group is in "Active" status for the Business Unit. If no, it displays an error message.

 

Help facility available.

The system displays the following:

Desc.

The description of the planning group.

 

Zoom facility available.

UOM

The production unit of measure of the planning group.

Plant

Use the drop-down list box to select the valid plants where the planning orders are created. The system gets the item or warehouse Organization units as specified in the CIM Component and also retrieves a blank value. Default value to this field is set to the “First Value” in the list.

Note: If “Plant” is not left blank, then the system checks whether the planning group is defined for the selected plant.  If no, it displays an error message. If “Plant” is left blank, then the system checks that the planning group has planning level as "Business Unit".  If no, it displays an error message.

Work Order No. Option

Use the drop-down list box to select the mode of creating the planning order number. You can select from “Automatic” or “Manual”. The system displays “Automatic” by default on launch of the page.

The system displays the following:

Matl. Planner

The material planner defined for the planning group. The system gets the material planner for the planning group and warehouse combination.

Plan Online

Select the check box to indicate whether the planning order is generated immediately or at a later stage. The system leaves the box "Checked" by default on launch of the page.

Planning Order No.

The unique number that identifies the planning order to be created for the selected planning group. Mandatory. In case “Automatic” Work Order Number Option is selected, the system generates the planning order number. In case “Manual” Work Order Number Option is selected, the Planning Order number has to be entered.

Note: For each row in the multiline, if the Work Order Number Option is “Manual” then the Planning Order No should not be blank and should unique for the Business Unit and should exist in the system.

Plan Qty.

The required quantity of the planning group to be planned. Mandatory. The system checks for each row in the multiline whether plan quantity is left blank and whether any fractions or decimals has been entered, as production UOM does not allow fractions. If yes, it displays an error message. The system also checks whether the plan quantity is greater than zero. If no, it displays an error message.

Start Date

The date on which the planning order has to be started. Mandatory.

Due Date

The date on which the planning order has to be completed. Mandatory.

Note: For each row in the multiline either Start Date or Due Date should be specified. The dates entered should be as per the Date Format. If Start Date is specified, it should be equal to or greater than the Current System Date.

Status

Use the drop-down list box to select the status of the planning order. You can select from “Requested”, “Accepted” or “Firmed”. The system displays “First Value” by default on launch of the page. If “Requested” value is not valid, then the other value in order is taken up as the default value.

The system displays the following in the “Order Information” multiline:

Problem

The problem related to the planning groups and the resources. It can be “No Problem”, “Material Problem”, “Capacity Problem”, “Matl & Cap. Problem”.

The system ensures that at least one row in the multiline has the values entered. For each row in the multiline, the planning group and planning group revision combination must be valid for the given order dates and status that is in “Active” status.

The system populates Created By with login ID and Created Date with system date. After Processing all rows in the multiline, the system retrieves the details of all the planning orders generated and displays them back onto the screen. 

In case if “Plan Online” field is not checked, then the planning order no would still be generated. But the planning order would not be planned for now and would be put to 'Q' status.  The Planning order no would get displayed along with the other details.

The login user ID and the system date are updated in the “Created By” and “Created Date” fields.

The system displays the following:

Created By

The login user ID of the person who has created the planning order.

Created Date

The date on which the planning order was created.

To proceed, carry out the following

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prerequisites

Mandatory