Select ECR To View Details

Activity overview

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This page allows you to select the requests to be viewed. You can specify the status, requested and required dates of the engineering change and also can specify the item or the component for which you want to fetch the details. On furnishing the above information, the system retrieves the corresponding engineering change request details in the multiline. You can select each record in the multiline and initiate the necessary links to view the details.   

The “Select ECR To View Details” page appears.

ECR Status

Use the drop-down list box to select the status of the engineering change request. You can select from "All", "Active", "Inactive",  "Authorized", "Resolved" or "Implemented". The system displays “Active” by default on launch of the page.

Requested By

The person who is responsible for requesting the engineering change.

Requested Date

The date on which the engineering change is requested.

ECR Desc.

The description of the engineering change request. The system checks whether the description of the engineering change request exists.

EC Need Date

The date on which the engineering change is required.

Item Code

The code identifying the item undergoing an engineering change.

 

Help facility available.

Component

The code identifying the component under engineering change.

 

Help facility available.

Maintained By

Use the drop-down list box to select the “Maintained By” control unit for which the login user has EC Create permissions. The system retrieves the control units from the “Organisation Model”.

The system retrieves all the engineering change details that match the details specified in the above-mentioned fields to the multiline.

The system displays the following in the “ECR Details” multiline:

ECR No.

The number identifying the engineering change request.

ECR Desc.

The description of the engineering change request.

Requested By

The person or department who has requested the engineering change.

Requested Date

The date on which the engineering change is requested.

EC Need Date

The date on by which the engineering change is required to be implemented.

ECR Status

The status of the engineering change request.

Maintained By

The “Maintained By” control unit for which the login user has EC permissions.

To proceed, carry out the following