This page allows you to make changes to the selected engineering change requests. The request for which the changes are required can be specified and the system retrieves the corresponding engineering change request details to the respective fields. You can make the necessary modification to the retrieved request details.

You can also modify the item, component and process plan details associated with the request, the implementation steps and notes defined for the engineering change request by initiating the respective links at the bottom of the page. The modified request can be implemented using the implement engineering change request link.

The “Edit Engineering Change Request” page appears.

ECR No.

The number identifying the engineering change request. It can be either a system generated number or manually entered number. If ECR number is system generated, then the system retrieves the numbering type with order type and also retrieves the number scheme and last generated number, to generate a new ECR No. If the ECR No is specified, the system checks whether the ECR No already exists or not. If it does not exist, the system will display an error message.

 

Help facility available.

ECR Desc.

The description of the engineering change request.

 

Zoom facility available.

ECR Status

Use the drop-down list box to select the status of the engineering change request. You can select from "Active", "Inactive",  "Authorized", "Resolved" or "Implemented". The system displays “Active” by default on launch of the page. You can set the document status as "Active" or "Inactive" status only. The system checks whether the engineering change permissions exist for the control unit requesting the engineering change. The options available are:

Maintained By

Use the drop-down list box to select the “Maintained By” control unit for which the login user has EC permissions. The system retrieves the control units from the “Organisation Model”.

EC Desc.

The description of the engineering change.

 

Zoom facility available.

Authorized By

The person authorized to implement the engineering change request. The system sets the “Login User” in Authorized by only if the ECR status is set to “Authorized”.

Problem Desc.

The description of the problem based on which the engineering change request is modified.

Benefits Desc.

The description of the benefits that are the outcomes of implementing engineering change.

ECR Type

Use the drop-down list box to select the type of the engineering change request. You can select from "Engineering", "Production", "Subcontracting" or "All". The system displays “Production” by default on launch of the page.

 

  • All – indicates that all the process plans/product structures are under engineering change.

 

  • Engineering – indicates that the process plans/product structures categorized as “Engineering” are under engineering change.

 

  • Production – indicates that the process plans/product structures categorized as “Production” are under engineering change.

 

  • SubContracting – indicates that the process plans/product structures categorized as “Subcontract” are under engineering change.

Priority

The priority with which engineering change request is to be proceeded. The system displays “1” by default on launch of the page. The range is between “1” (maximum) to “9” (least).

Requested By

The person who is responsible for requesting the engineering change.

EC Benefits

The cost saving accrued by implementing the engineering change. The number specified is the savings accrued in local currency value.

EC Need Date

The date by which the engineering change is to be implemented. The system checks whether the engineering change need date is earlier than the current date and displays an error message accordingly.

Requested Date

The date on which the engineering change is requested.

EC Impl. Cost

The cost of implementing the engineering change.

Addl. Information

Any additional information pertaining to the engineering change.

 

Zoom facility available.

The engineering change request can be set as "Active" or "inactive" status only. The system saves the modified engineering change request details.

To proceed, carry out the following

The system displays the following:

Created By

The login ID of the user who created the engineering change request.

Created Date

The date on which the engineering change request was created.

Edited By

The login ID of the user who modified the engineering change request.

Edited Date

The date on which the engineering change request was modified.