This page allows you to modify the selected Subcontract Order (SCO). Tell me more
Select “SCO No.” link from the Resultant Multiline or enter the SCO number at the top of the page and click on “Edit SCO”
The “Edit Subcontract Order” page appears.
The system displays the following details in the header
|
Workflow Status |
The workflow status of the subcontract order. |
Note: The field “Workflow Status” is visible only when “Workflow Parameter” is set as “Yes” in the “Company Parameter Setup” component for subcontract order.
|
Status |
The status of the SCO |
The system displays the following in the “SCO Details” group box
|
SCO No. |
The unique code identifying the SCO |
|
Amendment No. |
A unique code identifying the amendment done to the SCO. |
|
Ref. Quotation No. |
The unique number identifying the quotation raised for the SCO |
Modify the following in the “SCO Details” group box if required:
|
SCO Date |
The date on which the SCO was raised (Date Format) Mandatory |
|
Folder |
Use the drop-down list box to select the folder of the SCO. The drop-down lists the entire valid user-defined values for the “SCO folder” from the type setup component. |
|
Type |
Use the drop-down list box to select the type of SCO |
|
|
|
|
|
|
|
Supplier code |
The unique code identifying the supplier (Alphanumeric, 16) Mandatory |
|
Press <Enter> Key |
|
|
Help facility available |
The system displays the following information in the “Edit Subcontract Order”
|
Name |
The name of the supplier |
|
|
Zoom facility available |
Modify the following in the “SCO Details” group box if required:
|
Contact Person |
The contact person in the supplier organization (Alphanumeric, 45) |
|
Buyer |
Use the drop-down list box to select the buyer of the subcontracted items. The drop-down lists all the valid buyer code for the login ID entered which are active and effective on the SCO date along with the “Blank” option |
|
Hold |
Select/Deselect the checkbox to put the document into the “hold” status. When the document is put into the “hold” status the document cannot be approved for further processing. |
|
LOI |
Select/Deselect this checkbox to say that it is only a letter of intent to the supplier and not the actual SCO |
The system displays the following information in the “SCO Details” group box
|
Mode |
The transportation mode of the SCO |
|
Origin |
The origin of the SCO |
|
LOI to Order |
Displays whether it was a letter of intent to order |
Enter the following fields in the “SCO Details” group box
|
Remarks |
Any remarks pertaining to the SCO document (Alphanumeric, 100) |
|
|
Zoom facility available |
|
Approval Date |
The approval date of the SCO document to facilitate the processing of the document from that date. This changes the status of the subcontract document to “Approved” (Date Format) |
Modify the following in the ”SCO Amount Details” group box if required
|
Currency |
Use the drop-down list box to select the transaction currency of the SCO. The drop-down lists all the valid base currency defined for the financial company of “SCO OU” in the “Organization Setup” |
|
Press <Enter> Key |
Note: The “Currency” selected should be defined for the supplier code
Modify the following fields in the “SCO Amount Details” group box if required
|
Exchange Rate |
The exchange rate of the currency selected in the “Currency” drop-down list against the base currency of the financial company to which the “SCO” organization unit is associated |
Note: The “Exchange Rate” is displayed when the currency is selected in the “Currency” drop-down which can be modified
The system displays the following fields on the “SCO Amount Details” group box
|
Base Currency Value |
The base currency of the financial company to which the “SCO” organization unit is associated |
|
SCO Value |
The sum of all the line items “Total Value”. This is displayed when the “Create SCO” pushbutton or “Approve SCO” pushbutton is press |
|
Additional Charges |
The sum of all expenses on the supplier for all the line items. |
|
Total Value |
The sum of “SCO Value” and the “Additional Charges”. |
|
Total Value = “SCO Value” + “Additional Charges” |
The system displays the following fields in the “Project Details” group box:
|
Project OU |
The organization unit in which the project code has been created. |
|
Project Code |
A unique code identifying the project associated with subcontract order. |
|
Project Description |
The detailed description of project. |
Note: The “Project Details” group box is displayed only when SCO No. is associated with the project code.
Enter the following in the “default entries” group box. The values entered in the following fields will be defaulted for the items in the multiline
|
Receipt At |
Use the drop-down list box to select the organization unit where the item needs to be shipped. The drop-down lists all valid goods receipt organization unit in the “Purchase Order “ component, which belongs to the same financial company and business unit as the “SCO” organization unit. It also displays “Blank” and “None” option. “Blank” option is set as the default value for this |
|
Need Date
|
The date on which the items needs to be supplied by the supplier (Date Format) . The “Need Date” should be greater than the ‘SCO Date” |
|
Warehouse Code |
The code identifying the warehouse where the item needs to be stored (Alphanumeric, 10) |
|
Help facility available |
Note: The “Warehouse Code” should be blank if the “Subcontract type” is “Service”
|
Accounting Unit |
Use the drop-down list box to select the Accounting Unit. Accounting Unit is the finance book, which contains various accounts into which the financial entries pertaining to the transactions are maintained. The drop down lists all the finance books that are mapped to the Receipt OUs mapped to the SCO Login OU. |
|
AC usage |
Use the drop-down list box to specify the Account Usage, which points to an Account Code where the financial postings will be done. The corresponding Account Code for the selected Account Usage would have been defined in the “Account Rule Definition” component in Finance. These account codes are mapped to the finance books that are in turn mapped to the GR OUs of the login OU. This cannot be “Blank” if “Adhoc Item Class” has any value other than “None”. |
|
CC Usage |
Use the drop-down box to select the cost center usage (consumption Point) for the item. The drop-down lists all the CC usages defined for the “Purchase Cost Center” in the “Cost Rule Definition” component. The CC usage is specified whenever an item is moved to a Cost Center instead of a warehouse for Example: Service Item/ Adhoc Item.. “Blank” is set as the default value. This cannot be “Blank” if “Adhoc Item Class” has any value other than “None”. |
|
Budget ID |
Unique identifier for a particular Budget associated with the purchase of the Line Item. (Alphanumeric, 6). |
|
Help facility available |
|
|
Analysis Code |
The analysis code mapped to the Account code identified by the Account Rule Definition/ Account Usage. It is used for analysis purposes. (Alphanumeric, 5). Analysis code cannot be blank if the item has more than one analysis code. Analysis code should exists and be effective and active on the transaction date |
|
Help facility available |
|
|
Sub Analysis Code |
The sub analysis code mapped to the Analysis code that is used for analysis purpose. (Alphanumeric, 5). |
Click the “Default” pushbutton to display the default values in the “Item Details” multiline fields
Click the “Get Quotation Line No.” pushbutton to display the item details corresponding to line number in the reference quotation of the SCO
The system displays the following in the “SCO Item Details” Multiline
|
Quotation Line No. |
The unique number identifying the line number of the item in the quotation based on which the SCO is raised. |
Modify the following fields in the “Item Details” multiline, if required
|
Item Code |
The unique code identifying the item (Alphanumeric, 32). The “Item Code” should be valid on the transaction date. The “Item Code” cannot be blank if “Adhoc Item Class” is “None” |
|
Press <Enter> Key |
|
|
Help facility available |
|
|
Variant |
The variant of the item (Alphanumeric, 8) . The “Variant” cannot be blank if “Adhoc Item Class” is “None” and if “Item Code” is specified |
|
Description |
The description of the item (Alphanumeric, 150). The “Description” cannot be blank if “Adhoc Item Class” is “None” |
|
BOM Reqd. |
Use the drop down box and select “Yes” if Billing of material is required else select “no” |
Note: If “BOM Reqd” is set to “Yes” than atleast one multiline item should be defined in the “Issue” list page and “Receipt List” page
|
BOM Reference |
The unique code identifying the Bill Of Material (BOM) for the item to be subcontracted. The “BOM Reference” cannot be blank if “BOM Reqd” is “Yes” |
|
|
Help facility available |
Note: If “BOM Reqd” is “no” and “BOM Reference” is entered then atleast one Multine should be entered in the “Issue List” or “Inclusion Or Exclusion” page
|
Quantity |
The quantity of item required from the supplier (Integer).Mandatory This cannot be blank or less than or equal to zero for given row if “Item”, “Variant” or “Description” is specified |
|
UOM |
The unit of measurement of the items supplied by the supplier. The “UOM” should be valid on the transaction date. The “UOM” cannot be blank for given row if “Item”, “Variant” or “Description” is specified |
|
Help facility available |
|
|
Cost |
The unit cost of the item (Integer). Mandatory This cannot be blank or less than or equal to zero for given row if “Item”, “Variant” or “Description” is specified |
|
Per |
The number of items, which form a unit (Integer).Mandatory This cannot be blank or less than or equal to zero for given row if “Item”, “Variant” or “Description” is specified. This cannot be blank for stockable items |
|
Receipt At |
Use the drop-down list box to select the organization unit where the items are received. The drop-down lists all valid goods receipt organization unit in the “Purchase Order “ component, which belongs to the same financial company and business unit as the “SCO” organization unit. It also displays “Blank” and “None” option. “Blank” option is set as the default value |
|
Schedule Type |
Use the drop-down list box to select the Schedule Type. |
|
|
|
|
|
Need Date |
The date on which the items needs to be supplied by the supplier (Date Format). The “Need Date” should be greater than the ‘SCO Date”. This should not be blank for “Single” schedule type. This should be blank for “Staggered” schedule type |
|
Warehouse Code |
The code identifying the warehouse where the item is stored (Alphanumeric, 10). This should be blank if the “Subcontract type” is “Service” and if schedule type is “Staggered” and if the “Adhoc Class” is other than “None”. This cannot be blank for subcontract type other then “Service” |
|
Help facility available |
|
|
Accounting Unit |
Use the drop-down list box to select the Accounting Unit. Accounting Unit is the finance book, which contains various accounts into which the financial entries pertaining to the transactions are maintained. The drop down lists all the finance books that are mapped to the Receipt OUs mapped to the SCO Login OU. |
|
Budget ID |
Unique identifier for a particular Budget associated with the purchase of the Line Item. (Alphanumeric, 6). |
|
Help facility available |
The system displays the following information
|
Basic Value |
The basic value of the line item |
|
Basic Value = Cost /Per * Quantity |
|
|
Total Value |
This value is displayed when the “Create SCO” or “Approve SCO” pushbutton is pressed. |
|
Total value = Basic Value (Line item) + TCD Value payable to document supplier |
|
|
Drawing Revision No. |
The unique engineering drawing revision number of the item given within a budget identification number |
Enter the following Details in the “SC Item Details” group box
|
Adhoc Item Class |
Use the drop down list box to select the classification under which the non-codified items are defined. The drop-down displays all the “Adhoc item class” defined in the “Type Setup” Component. |
|
Ref Doc type |
Unique identification number of a reference document is mentioned in this field. The Reference documents can be any external document line Production Work Order, Maintenance Work Order |
|
Ref Doc No |
The unique code identifying the reference document. (Alphanumeric, 20) |
|
Ref Doc Line no |
The line number of the item in the reference document to which the line item in the SCO refers (Integer) |
The system displays the following informations in the “SC Item Details” group box
|
WBS ID |
The code that identifies the WBS mapped to the subcontract order. |
|
Task Code |
The task code mapped to the subcontract order. |
|
Task Desc. |
The detailed description of the task code. |
Enter the following Details in the “SC Item Details” group box
|
Comments |
Comments if any pertaining to the line item in the SCO (Alphanumeric, 256) |
Click “Edit SCO” to save the modified values to the SCO
The modified values of the SCO are saved
The system displays the following
|
Created By |
The name of the user who created the SCO |
|
Created Date |
The date on which the SCO was created. |
|
Last Modified By |
The name of the person who last modified the SCO |
|
Last Modified Date |
The date on which the SCO was last modified. |
Click the “Edit and Approve SCO” pushbutton to approve the SCO, if the SCO is of single schedule and without any quality specification
The status is set to “Open” if the creator also has the Approval rights and if the LOI field is not checked else the status is set to “Approved LOI”
The system displays the following
|
Created By |
The name of the user who created the SCO |
|
Created Date |
The date on which the SCO was created. |
|
Last Modified By |
The name of the person who last modified the SCO |
|
Last Modified Date |
The date on which the SCO was last modified. |
Click “Delete SCO” to cancel the SCO created
The system updates the status of the document to “Deleted”. A deleted SCO cannot be used for any transaction
To proceed, carry out the following
Select the “View Item Details” link at the bottom of the page for viewing the items details of the SCO
Select the “View BOM Details” link at the bottom of the page for viewing the Billing of Materials for the SCO
Select the “View Warehouse Details” link at the bottom of the page to view the warehouse details
Select the “View Budget Details” link at the bottom of the page for viewing the Budget Details of the items in the SCO
Select the “Specify Receipt List” link at the bottom of the page to specify the list of items to be received from the supplier
Select the “Specify Issue List” link at the bottom of page to specify the issue details for the items in the SCO
Select the “Specify Inclusion/Exclusion List” link at the bottom of the page to specify the items to be issued and received from the supplier
Select the “Specify Schedule and Distribution” link at the bottom of the page to specify the schedule and distribution details for the order
Select the “Specify Terms and Conditions ” link at the bottom of the page to specify the Terms and conditions.
Select the “Specify Taxes/Charges/Discount Details ” link at the bottom of the page to specify the Tax, charges and discount details.
Select the “Tax Calculation - Summary ” link at the bottom of the page to specify the tax details for the items
Select the “Specify Quality Attributes ” link at the bottom of the page to specify quality Attributes
Select the “Specify SCO-SCR Coverage” link at the bottom of the page to specify the SCO to subcontract request coverage
Select the “Attach notes ” link at the bottom of the page to attach any notes
Select the “View Earliest Available Date Details” link at the bottom of the page to earliest available dates of the item selected
Select the “View Disposition Review Details” link at the bottom of the page to view the disposition review details
Select the “View Free Stock Review Details” link at the bottom of the page to view the free stock review details
Select the “View Stock Status Details” link at the bottom of the page view status of the stock
Select the “View Warehouse Stock Status Details” link at the bottom of the page to view the status of the stock in a specific warehouse
Select the “View Supplier Details” link at the bottom of the page to view the supplier details
Select the “View Buyer Details” link at the bottom of the page to view the buyer details
Select the "Operational Checklist" link to record the check list required for the subcontract order.
Select the “Specify Retention Details” link at the bottom of the page to specify the retention details of the order.
Note: The “Specify Retention Details” link is accessed only when “Retention amount calculation to be Order Specific” parameter is set as “Yes” in Common Parameters activity of Company Parameter Setup component.
Select the “Specify Order – BG Mapping” link at the bottom of the page to map the purchase order / sale order details to the bank guarantee.
Edit Subcontract Order – An Overview
Only the SCO, which are in the “Fresh” or “Draft” status, can be modified. This page allows you to modify the date, type, folder, validity dates, supplier, and buyer of the SCO. This page also allows you to modify the transaction currency, exchange rate of the SCO.
You can also modify the item details such as the ordered quantity of the item, item code, and variant of the item, the reference document of the SCO and the tolerance percentage of the item.
This page allows you to delete the selected SCO. Only the SCO(s), which are in the “Fresh”, “Draft”, Approved LOI or Returned SCO status can be deleted. Deletion can only be done if no “Advance Amount” has been paid towards the SCO. On deletion the status of the SCO is updated to “Deleted”. Deleted SCO cannot be used in any transaction. This page also allows you to approve the selected SCO.