This page allows you to amend the SCRS, which are in “Open” status. Tell me more
Select “SC release slip No.” link from the Resultant Multiline or enter the SC release slip number at the top of the page and click on “Amendt SC release slip”
The “Amend SC release slip” page appears
The system displays the following in the header
|
Status |
The status of the SCRS |
The system displays the following information in the “SC Release Slip Details” group box
|
SC Release Slip No. |
The unique code identifying the SCRS. |
|
|
Amendment No. |
A unique code identifying the amendment done to the SCRS. |
|
|
|
|
|
Enter the following fields in the “SC Release Slip Details” group box
|
SC Release Slip Date |
The creation date of the SCRS |
|
Folder |
Use the drop-down list box to select the classification of the SCRS document by which the company refers. The drop-down lists all the valid folders under the “SCRS folder” class code n the “Type Setup” component |
|
Buyer |
Use the drop-down list box to select the buyer of the subcontracted items. The drop-down lists all the valid buyer code for the login ID entered which are active and effective on the SCR date along with the “Blank” option. Capturing the Buyer depends on the System Parameter value (‘Buyer Control Mandatory’ set as ‘YES’ or ‘NO’) ; if a Buyer is specified in a SCRS, then the items ordered are checked for the validity of the Buyer. |
The system displays the following information “SC Release Slip Details” group box
|
BSCO No. |
The unique code identifying the BSCO |
|
Blanket SCO Date |
The creation date of the blanket subcontract order (Date Format). Mandatory The system date is displayed by default. |
|
Blanket Order Type |
Use the drop-down list box to select the type of subcontract Order |
|
|
|
|
|
|
|
Supplier Code |
The unique identifying the supplier of the BSCO |
|
Name |
The name of the supplier |
|
Contract Type |
The type of the contract |
|
|
|
|
|
|
|
BSCO Created At |
The OU where the BSCO was created |
|
BOM Modifiable in SC Rel Slip |
Indicates whether the Bill of Material (BOM) associated with the line items of the SCRS is modifiable or not |
|
Rate Control |
Displays whether control on rate is needed for the period of blanket subcontracts |
Enter the following fields in the “SC Release Slip Details” group box
|
Remarks |
Remarks if any, pertaining to the SCRS (Alphanumeric, 256) |
|
|
Zoom facility available |
|
Hold |
Select/Deselect to put the SC release slip in to the hold status. A held SC Release slip cannot be approved. A document is put into the “held” status when certain uncertainty exists with the document |
|
Contact Person |
The contact person in the supplier organization (Alphanumeric, 45) |
|
Approval Date |
The date on which the SCRS is approved for further processing (Date Format) |
The system displays the following information in the "SC Release Slip Amount Details” group box
|
SC Release Slip Amount |
The total value of the SC Release Slip. This sum of the values of the all the items in the SC Release Slip. This is displayed when the “Create” or “Create and Approve” pushbutton is pressed |
|
Additional Charges |
Additional charges incurred on the SC Release Slip. This is sum of all the line level TCDs and document level TCD. |
|
Total value |
The total value of the SC Release Slip. This is sum of “SC Release Slip Value” and “Additional Charges”. This is displayed when the “Create” or “Create and Approve” pushbutton is pressed |
|
Currency |
The transaction currency of the SC Release Slip. |
|
Exchange Rate |
The exchange rate of the currency selected in the “Currency” drop-down list against the base currency of the financial company to which the “SCRS” OU is associated. The default value is set as “1”. This cannot be blank |
|
Base Currency Value |
The base currency of the financial company to which the “SCRS” OU is associated |
The system displays the following information in the “Project Details” group box:
|
Project OU |
The organization unit in which the project is defined. |
|
Project Code |
The unique code identifying the project associated with subcontract release slip. |
|
Project Description |
The detailed description of the project associated with subcontract release slip. |
Enter the following fields in the “Default Entries” group box.
|
Budget ID |
Unique identifier for a particular Budget associated with the purchase of the Line Item. (Alphanumeric, 6). |
|
Help facility available |
|
|
Need Date |
The date on which the items needs to be delivered (Date Format) |
|
CC Usage |
Use the drop-down box to select the cost center usage (consumption Point) for the item. The drop-down lists all the CC usages defined for the “Purchase Cost Center” in the “Cost Rule Definition” component. The CC usage is specified whenever an item is moved to a Cost Center instead of a warehouse Example:: Service Item/ Adhoc Item.. “Blank” is set as the default value. This cannot be “Blank” if “Adhoc Item Class” has any value other than “None”. |
|
AC Usage |
Use the drop-down list box to specify the Account Usage, which is used to get an account code from ARD component (Account Rule Definition). Specifying a AC Usage is mandatory in case the line item is a Non-Stockable item. |
|
Analysis Code |
Code/Identifier that is mapped to the account code that is used for analysis purposes. . (Alphanumeric, 5). Help Facility Available |
|
Sub Analysis Code |
Code/Identifier that is mapped to the analysis-code that is used for analysis purpose. . (Alphanumeric, 5). |
|
Receipt At |
Use the drop-down list box to select the OU where the item needs to be received. The drop-down lists all valid goods receipt OU in the “Purchase Order “ component, which belongs to the same financial company and business unit as the “SCRS” OU. It also displays “Blank” and “None” option. “Blank” option is set as the default value for this |
|
Warehouse Code |
The code identifying the warehouse where the item needs to be stored (Alphanumeric, 10). The warehouse entered must be defined in any of the GR OUS mapped to the “SCRS” component if the code is in “Active” status. |
|
Help facility available |
Click the “Default” pushbutton to display the values entered in the “Default Entries” group box in the corresponding fields in the “SC Item Details” multiline
The system displays the following in the “SC Item Details”
|
Line No. |
The line number of the item |
Modify the following fields in the “SC Item Details” multiline if required:
|
BSCO Line No. |
The unique number identifying the line number of the item in the BSCO (Integer) |
|
Press <Enter> Key |
|
|
Help facility available |
The system displays the following in the “SC Item Details” Multiline
|
Item Code |
The unique code identifying the item |
|
Variant code |
The variant of the item |
|
Description |
The textual description of the item |
|
BSCO Balance Quantity |
The quantity of items which has not be delivered as per the BSCO |
Modify the following fields in the “SC Item Details” multiline if required:
|
Quantity |
The number of units to be requested (Integer). The value should not be negative or zero. This should be entered for the BSCO contract type “Value”,” Quantity”. If the contract type is “Quantity” then value specified in the “Quantity” field cannot be more than the “BSCO balance allocated quantity”. |
Note: The “Quantity” cannot be lesser than sum of all the quantity in the “Receipt Acknowledgement” which is freezed
The system displays the following in the “SC Item Details” Multiline
|
UOM |
The unit of measurement |
Modify the following fields in the “SC Item Details” multiline if required:
|
Cost |
The cost of the number of units specified in the “Per” field (Integer) Mandatory Cost should be a positive number |
|
If the contract type is “Rate” then the value specified in the “Cost” field should not exceed the previous cost specified for the BSCO |
|
|
If the contract type is “Value” and the rate control is checked to “Yes” then the cost cannot be more than BSCO cost specified earlier + BSCO cost specified earlier * rate tolerance +ve |
|
|
Press <Enter> Key |
|
|
Per |
The number of units for which the cost is applied (Integer) |
|
Budget ID |
Unique identifier for a particular Budget associated with the purchase of the Line Item. (Alphanumeric, 6). |
|
Press <Enter> Key |
|
|
Help facility available |
The system displays the following
|
BOM Reqd. |
Use the drop down box and select “Yes” if Billing of material is required else select “no” |
Enter the following :
|
BOM Reference |
The unique code identifying the Bill of Material (BOM) for the item to be subcontracted. The “BOM Reference” cannot be blank if “BOM Reqd” is “Yes” |
|
Press <Enter> Key |
|
|
Help facility available |
|
|
Receipt At |
Use the drop-down list box to select the organization unit where the items are received. The drop-down lists all valid goods receipt organization unit in the “Purchase Order “ component, which belongs to the same financial company and business unit as the “SCRS” organization unit. It also displays “Blank” and “None” option. “Blank” option is set as the default value |
|
Warehouse Code |
The code identifying the warehouse where the item needs to be shipped (Alphanumeric, 10). This should be blank if the “Blanket Subcontract type” is “Service”, schedule type is “Staggered” and if the “Adhoc Class” is other than “None”. This cannot be blank for blanket subcontract type other then “Service”. The warehouse entered must be defined in any of the GR OUS mapped to the “SCRS” component if the code is in “Active” status. |
|
Help facility available |
|
|
Schedule Type |
Use the drop-down list box to select the schedule type of the item in the SCRS |
|
|
|
|
|
Need Date |
The date on which the items needs to be delivered (Date Format). This should not be blank if the schedule type is “Single”. This should be blank if the schedule type is “Staggered”. The “Need Date” should be greater than the “SCRS” date |
|
Accounting Unit |
Use the drop-down list box to select the Accounting Unit. Accounting Unit is the finance book, which contains various accounts into which the financial entries pertaining to the transactions are maintained. The drop down lists all the finance books that are mapped to the Receipt OUs mapped to the SCRS Login OU. |
|
Ref Doc No |
The unique code identifying the reference document. (Alphanumeric, 20) |
|
Ref Doc Line no |
The line number of the item in the reference document to which the line item in the SCRS refers (Integer) |
The system displays the following information “SC Item Details”
|
Drawing Revision No |
The unique engineering drawing revision number of the item |
|
Basic Value |
The basic value of the line item |
|
Basic Value = Cost /Per * Quantity |
|
|
Total Value |
This value is displayed when the “Create Blanket SCO” or “Approve Blanket SCO” pushbutton is pressed. This is the sum of the basic value of the line item and the TCD amount to be included in the cost of the line item. |
|
Total value = Basic Value (Line item) + TCD Value (add to stock) |
|
|
Adhoc Item Class |
The item class of the non-codified item. |
|
Rate Tolerance +ve |
The acceptable percentage of increase in the price of item. |
Modify the following fields in the “SC Item Details” multiline if required:
|
Remarks |
Remarks if any, pertaining to the item in the SCRS |
Note: Atleast one item code-variant combination or Item description has to be entered in the Multiline.
The system displays the following information in the “SC Item Details” multiline:
|
WBS ID. |
A unique code identifying the work breakdown structure of the item. |
|
Task Code |
The task code mapped to the subcontract release slip. |
|
Task Desc. |
The detailed description of the task code. |
Check the box in the “Select” column of the multiline, to select the BSCO line items to be added to the SCRS
Click the “Amend SC Release Slip” pushbutton to save the modification made to the SCRS
If all the mandatory information has been entered and validated the status of the SCRS is set to "Fresh" upon creation of the document
Click the “Approve SC Release Slip” pushbutton to edit and approve the SCRS for further transactions on the document
If all the mandatory information has been entered and validated the status of the SCRS is set to "Open" upon creation of the document
An auto invoice is generated for the total value of those line items with two-way matching type and if auto invoicing is set to “Yes”
The system displays the following fields:
|
Created By |
The login ID of the person who created the subcontract release slip |
|
Created Date |
The date on which the subcontract release slip |
|
Last Modified By |
The login ID of the person who last modified the subcontract release slip |
|
Last Modified Date |
The date on which the subcontract release slip was last modified |
To proceed, carry out the following
Select the “View Item Details” at the bottom of the page to view the details of the item selected in the multiline
Select the “View BOM Details” link at the bottom of the page to view the Bill Of Material Details
Select the “View Budget Details” link at the bottom of the page to view the budget details.
Select the “View Warehouse Details” link at the bottom of the page to view the Warehouse details
Select the “Specify Receipt List” at the bottom of the page to specify the list of items to be received from the supplier
Select the “Specify Issue List” at the bottom of the page to specify the list of items to be issued to the supplier
Select the “Specify Inclusion/Exclusion List” at the bottom of the page to specify the items that are included and excluded for issue for the line items in the subcontract release slip
Select the “Specify Schedule and Distribution” at the bottom of the page to specify schedule and distribution details for the items in the subcontract release slip
Select the “Specify Terms & Condition” at the bottom of the page to specify the terms and condition pertaining to the subcontract release slip
Select the “Specify TCD Details” at the bottom of the page to specify the tax, charges and discount applicable on the line items and entire document of subcontract release slip
Select the “Tax Calculation - Summary” at the bottom of the page to specify the taxdetails for the subcontract release slip
Select the “Specify Quality Attributes” at the bottom of the page to specify quality specification for the line items in the subcontract release slip
Select the “Specify SC Release Slip-SCR Coverage” at the bottom of the page to specify the coverage done by the subcontract release slip against the subcontract request,
Select the “Attach Notes” at the bottom of the page to attach additional information to the subcontract release slip
Select the “View Earliest Available Date Details” link at the bottom of the page to view the earliest date when the items will be available
Select the “View Disposition Review Details” link at the bottom of the page to view the Disposition details pertaining to the line items
Select the “View Free Stock Review Details” link at the bottom of the page to free stock review details
Select the “View Stock Status Details” link at the bottom of the page to view the status of the stock
Select the “View Warehouse Stock Status Details” link at the bottom of the page to view the status of the stock in the warehouse
Select the "Operational Checklist" link to record the check list required for the subcontract release slip.
Amend SC Release - An Overview
Amendment of SCRS is allowed only for those line numbers for which no GR has been created or is under processing. You can add new line items for the SCRS, while amending the SCRS details.
You can amend the SCRS, only if the acceptance details for the goods receipt against the particular SCRS have been frozen. If the item has already been accepted, then only the remaining items can be amended. If the goods have not yet been received, the SCRS details can be amended.
Upon amendment, the system updates the status of the SCRS to “Amended”, and increments the amendment number for that SCRS. You can also confirm the amendment to the SCRS. Once confirmed, the SCRS attains the “Fresh” status. The system stores the login user ID and the server date along with the modification details.