Create Engineering Change Request

Prerequisites

Unified Glossary

Basics of using Ramco Enterprise series web page

Using online help

This page allows you to create engineering change requests for the items. Tell me more

The “Create Engineering Change Request” page appears.

ECR No.

The unique number identifying the engineering change request. Mandatory. It can be either a system generated number or manually entered number. If ECR number is system generated, then the system retrieves the numbering type with order type and also retrieves the number scheme and last generated number, to generate a new ECR No. If the ECR No is specified, the system checks whether the ECR No already exists or not. If it exists, the system will display an error message.

 

Help facility available.

ECR Desc.

The description of the engineering change request.

 

Zoom facility available.

ECR Status

Use the drop-down list box to select the status of the engineering change request. You can select from "Active", "Inactive",  "Authorized", "Resolved" or "Implemented". The system displays “Active” by default on launch of the page. You can set the document status as "Active" or "Inactive" status only. The system checks whether the engineering change permissions exist for the control unit requesting the engineering change. The options available are:

 

  • Active – indicates a valid engineering change request.

 

  • Inactive – indicates an invalid engineering change request.

 

  • Authorized – indicates an authorized engineering change request.

 

  • Resolved – indicates a resolved engineering change request.

 

  • Implemented – indicates an implemented engineering change request.

Maintained By

Use the drop-down list box to select the “Maintained By” control unit. The system retrieves the control units from the “Organisation Model”.

EC Desc.

The description of the engineering change.

 

Zoom facility available.

Problem Desc.

The description of the problem for which the engineering change request is generated.

Benefits Desc.

The description of the benefits that are the outcomes of Implementing the engineering change.

ECR Type

Use the drop-down list box to select the type of the engineering change. You can select from "Engineering", "Production", "Subcontracting" or "All". The system displays “Production” by default on launch of the page. The options available are

 

  • All – indicates that all the process plans/product structures are under engineering change.

 

  • Engineering – indicates that the process plans/product structures categorized as “Engineering” are under engineering change.

 

  • Production – indicates that the process plans/product structures categorized as “Production” are under engineering change.

 

  • SubContracting – indicates that the process plans/product structures categorized as “Subcontract” are under engineering change.

Priority

The priority based on which the engineering change request is to be executed. The system displays “1” by default on launch of the page. The range is between “1” (maximum) to “9” (least).

Requested By

The person who is requesting the engineering change. Mandatory.  The system displays “Logon Username” by default on launch of the page .

EC Benefits

The cost saving accrued by implementing the engineering change. The number specified is the savings accrued in local currency value.

EC Need Date

The date by which the engineering change is to be implemented. The system checks whether the engineering change need date is earlier than the current date and displays an error message accordingly.

Requested Date

The date on which the engineering change is requested. Mandatory. The system displays “Current Date” by default on launch of the page .

EC Impl. Cost

The cost of implementing the engineering change.

Addl. Information

Any additional information pertaining to the engineering change.

 

Zoom facility available.

The system saves the engineering change details along with the requested by as “Login User ID” and requested date as “Current System Date” for engineering change request number. If the status of the engineering is set to “Active”, then the system sends a message to the “Authorizer”. 

To proceed, carry out the following

The system displays the following:

Created By

The login ID of the user who created the engineering change request.

Created Date

The date on which the engineering change request was created.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Create Engineering Change Request - An overview

Activity overview

The purpose of engineering change could be to effect changes in the design of the item or the usage of an alternate item or changes in the process plan to manufacture the item. Any user who has permissions to create an engineering change request can make a request using this page. You can specify the engineering change request along with other request details like the purpose of creating the request, the problems for which the request is raised and the benefits derived on initiating the request.

You can also define the date on which the engineering change is required and requested together with the cost of implementing the engineering change. After furnishing the necessary information the engineering change request number can be generated automatically by the system using the numbering scheme defined.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 